说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 斜拉扣挂法
1.
Application of Cable-stayed Suspending and Connecting Method in Half-through Steel-pipe Concrete Arch
斜拉扣挂法在半穿式钢管混凝土拱的应用
2.
Application of cable erection and strayed knotting method to construction of concrete filled steel tubular arch bridge
缆索吊装斜拉扣挂法在钢管混凝土拱桥施工中的应用
3.
Research on Buckling Construction Technology of Five-span Coninuous Girder Steel-tube Concrete Arch Bridge
五跨连续梁钢管混凝土拱桥斜拉扣挂法施工技术
4.
A Study on Cable-Removing Scheme for Cable-Stay System of CFST Arch Bridge
某钢管混凝土拱桥斜拉扣挂系统拆扣方案研究
5.
Analysis of Influencing Accuracy Factor of Steel Box Arch Bridge Construction Control and Hoisting;
斜拉扣挂钢箱拱桥施工控制及吊装精度影响因素分析
6.
level(l) ing box
悬挂装置斜拉杆调节器
7.
Construction Techniques for Integral Lifting and Installation of Front-Support Form Travelers of Cable-Stayed Bridge
斜拉桥前支点挂篮整体吊装施工技术
8.
Hook the bottom of the earhook onto the lower hinge pin, then lift and pull the top of the earhook over the upper hinge pin.
将耳机挂钩底部按在耳机下端的扣上,从下端按扣拉起并将挂钩上端与耳机顶部扣紧。
9.
The lie can not is zipped properly.
钮扣遮布的拉链没法扣好。
10.
The Shape and Aseismic Behaviors Analysis of Stayed Cable with Suspended Roof Structures;
斜拉悬挂屋盖结构的形态和抗震性能分析
11.
Design of Guyed Form Travelers for a Cable-Stayed Bridge with Conjoined Twin Pylons,Four Cable Planes and Separated Decks
双塔连体四索面分幅斜拉桥牵索挂篮设计
12.
The design and application of triangle-inclined-pull-shape form light traveling carriage of Deyu super large bridge
德禹特大桥三角斜拉式轻型挂篮的设计及应用
13.
On thought of new cable-stayed light hanging basket with combined diamond
新型斜拉组合式菱形轻型挂篮构思与分析
14.
Superwide suspension basket design and top pressure test of one cable-stayed bridge in Zhejiang
浙江某斜拉桥超宽挂篮设计及预压试验
15.
Damage alarming of cable-stayed bridge structures based on cable fundamental natural frequencies
基于斜拉索基频的斜拉桥损伤预警方法
16.
Algorithm for Relevant Parameters of Stay Cables of Cable-Stayed Bridge with Span Length of 1000-m Scale
千米级斜拉桥斜拉索相关参数计算方法
17.
Construction Method and Linear Control of Diagonal Pre-Stressed Box Girder Erection with Guyed Traveler
斜交预应力箱梁挂篮施工法及其线形控制
18.
Analysis of Cable Force and Pre-camer during Arch Rib Installation of Daninghe Bridge;
大宁河特大桥拱肋安装斜拉扣索索力与预抬量计算分析