说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电缆头
1.
Cause Analysis and its Treatment to 35 kV Cable Head Dielectric Breakdown Accident in Substation
变电站35 kV电缆头击穿事故原因分析及处理
2.
Discussion on Reasions of 35kV Outlet Cable Explosion Accident on Transformer Substation
某变电站35kV出线电缆头爆炸事故起因探析
3.
EX(d).ARMORED-CABLE PACKING GLAND
防爆铠装电缆密封接头
4.
WATER-PROOF ARMORED-CABLE PACKING GLAND
防水铠装电缆密封接头
5.
AmerCable also offers a rugged line of ready-to-use cable assemblies.
美国电缆同时提供电缆接头的预制,实现矿用电缆的“交钥匙”工程。
6.
On-line monitoring systems for power cable junctions in city zone
城区电力电缆接头故障在线监测系统
7.
hank of cable
电缆盘, 一盘电缆
8.
live cable test cap
电缆在加压测试时用的终端接头
9.
Waterproof reliability Comparison of 10kV XLPE power cable joints in Shanghai urban area
上海城区10kV电缆中间接头防水性比较
10.
electric power insulated cable [for a voltage of between 81 and 1000v, whether or not fitted with connectors]
电力绝缘电缆[81至1000V电压用,不论是否装有接头]
11.
On-Line PD Monitoring System for Power Cable Splice Based on FPGA
基于FPGA的电力电缆接头局部放电在线监测系统
12.
Cable operators also install fiber optic cables from the head end to a fiber distribution node.
有线电视运营商也须把光缆从头端(主设备)接到光缆分配节点。
13.
We are a specialty electrical wire and cable distributor dedicated to providing solutions to customers in United States.
我公司为美国公司,专营电线,电缆,线束,插头等。
14.
On-line Fault Monitoring and Early-warning System for Power Cable Joints in City Zone
城区电力电缆接头故障在线监测与预警系统
15.
Design of Prefabricated Joints for HVDC XLPE Power Cables
高压直流XLPE电力电缆预制式接头的设计
16.
Thinking on Short Circuit Accident due to Discharge of 110 kV Dry Cable Terminal
一起110 kV干式电缆终端头放电短路事故的思考
17.
Statistical characteristics analysis of partial discharge in high-voltage cable joint
高压电缆中间接头局部放电统计特性分析
18.
Design of High-Voltage Cable Jointed-node Wireless Monitor and Control System
高压电力电缆接头温度无线检测控制系统设计