说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 输电约束
1.
A METHOD FOR GENERATION BIDDING AND TRANSACTION CONSIDERINGTRANSMISSION LOSSES AND TRANSMISSION CONSTRAINTS;
考虑网损和输电约束的发电竞价交易方法
2.
Research on Market Power Performance of Generation Companies in the Transmission Constrained Electricity Markets
考虑输电约束的发电企业市场力行为分析
3.
Joint Equilibrium Analysis for Electricity Forward and Spot Markets With Transmission Constraints
计及输电约束的电力远期与现货市场联合均衡分析
4.
LINEAR SUPPLY FUNCTION EQUILIBRIUM WITH DEMAND SIDE BIDDING AND TRANSMISSION CONSTRAIN;
计及输电约束和需求方投标的线性供应函数均衡点的求解算法
5.
The Integrative Computation of Power System Transfer Capability with Voltage Stability Constrains;
考虑电压稳定性约束的输电能力综合计算
6.
Development of Optimal Bidding Strategies for Generation Companies Considering Transmission Capacity Constraints;
计及输电容量约束的发电公司最优报价策略
7.
Research on Transmission System Planning Based on Chance Constrained Programming;
机会约束规划在输电系统规划中的应用研究
8.
Impacts of Transmission Line Limits on Electricity Market Equilibrium;
线路传输容量约束对电力市场均衡的影响
9.
TRANSMISSION CONSTRAINED MARKET POWER ANALYSIS BASED ON LSFE;
使用LSFE分析计及输电系统约束的市场势力
10.
An Efficient Reliability Evaluation Method for Distribution System With Transmission Capacity Constraints
考虑传输容量约束的配电网可靠性快速评估
11.
Nonlinear adaptive control for the turbine steam valve with input constraints
考虑输入约束的发电机汽门非线性自适应控制
12.
Power Transmission System Planning Based on Grey Chance Constrained Programming
基于灰色机会约束规划的输电系统规划
13.
Fast Calculation of Probabilistic Total Transfer Capability Considering Voltage Stability Constraints;
考虑静态电压稳定约束的概率最大输电能力快速计算
14.
Research on Fast Calculation of Probabilistic Total Transfer Capability Considering Static Voltage Stability Constraints;
考虑静态电压稳定约束的概率最大输电能力快速计算研究
15.
AVAILABLE TRANSFER CAPABILITY EVALUATION OF INTER-CONNECTED POWER SYSTEM WITH THE INCORPORATION OF DYNAMIC VOLTAGE STABILITY CONSTRAINTS;
考虑动态电压稳定约束的互联系统间有效输电能力计算
16.
Study of Available Transfer Capability Considering the Security and Stability Constraints in Electricity Market Environment
电力市场环境下计及安全稳定约束的可用输电能力研究
17.
A Chance Constrained Transmission Network Expansion Planning Method Associated with Load and Wind Farm Variations
考虑负荷和风电出力不确定性的输电系统机会约束规划
18.
Research on Calculation of Total Transfer Capability with Transient Stability Constraint;
计及暂态稳定约束的区域间最大输电能力的研究