说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大跨度高边墙地下洞室
1.
Systematical Engineering Geological Study on the Stability of Surrounding Rock Mass with Large Span High Side-Wall Underground Caverns and Their Support Proposals;
大跨度高边墙地下洞室群围岩稳定性评价及支护方案的系统工程地质研究
2.
Study on Stability and Optimization for Excavation Programmes of Large-scale Underground Houses with High Sidewalls
大型高边墙地下洞室施工稳定性及方案优选研究
3.
A Case of Treatment for Large Span Foundation with Opening under Highrise Housing
高层住宅下大跨度开洞地基处理的工程实例
4.
The Geological Engineering Study of the Surrounding Rock Mass Stability of the Big Span and Deep Underground Cavities of the Second Hydro-electrical Power Station of Jin Ping;
大跨度、深埋地下洞室群围岩稳定性工程地质研究
5.
Application of CAD three-dimensional model to the stability analysis of underground cavity's wall
CAD真三维实体模型在地下洞室边墙稳定性评价中的应用
6.
Study on Work Behavior of Liner Structure of Underground Surge-chamber with High Side Wall;
高边墙地下调压室衬砌结构工作性态研究
7.
Study on Settlement of Diaphragm Wall Foundation of Large Span Bridge in Loess Area;
黄土地区大跨度桥梁地下连续墙基础沉降研究
8.
Construction Crucial Technique of the Long-span Tunnel Portals in Unfavorable Geological Condition;
不良地质条件下大跨度隧道洞口施工关键技术
9.
DYNAMIC RESPONSE ANALYSIS OF ROCK UNDERGROUND CAVERNS IN HIGHLY SEISMIC REGION
高地震烈度区岩体地下洞室动力响应分析
10.
The Steel Framing Reinforced Technology Researches of Big-span Gallery Bearing Undergroud Nuclear Xplosion;
核爆作用下大跨度洞室钢框架防护加固技术研究
11.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
12.
Crack Mechanism and Controlling Technique of High-rise Building Basement Wall;
高层建筑地下室侧墙温度裂缝机理及控制技术
13.
Effects of Underground Structure Surrounding Soils on Dynamic Characters and Earthquake Responses of Large-Span Structures
地下室侧面土体对大跨度结构地震反应的影响
14.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
15.
Study on Stability Analysis and Intelligent Optimization for Large Underground Caverns under High Geostress Condition;
高地应力下大型地下洞室群稳定性分析与智能优化研究
16.
Study on the Stability Induced by Stepped Excavations and Rheological Effect of Underground Cavern Groups in High In-Situ Stress Areas
高地应力条件下大型地下洞室群分步开挖稳定性及流变效应研究
17.
Artificial simulation of nonstationary artificial seismic motion for large-scale underground cavern group located in alpine gorge area
高山峡谷地区大型地下洞室群非平稳人工地震动拟合
18.
Construction Technology of Shallow Buried Wide Span Tunnel Adjacent to Building in Loose Ground Containing Water
松散含水地层邻楼房大跨浅埋洞室施工技术