1.
The Demonstration of Waterpower Gradual Exploitation in the Datong River Section in Gansu;
大通河甘肃省河段水电梯级开发论证
2.
CUMULATIVE EFFECTS OF WATER TEMPERATURE BY CASCADE HYDROPOWER STATIONS BUILT ON UPPER AND MIDDLE REACHES OF THE WUJIANG RIVER
乌江干流中上游水电梯级开发水温累积效应
3.
cascade hydroelectric power stations on Columbia River
哥伦比亚河梯级水电站
4.
Hydraulic Transients Research of Diversion System in Cascade Hydropower Stations Connected by Open Channel;
梯级电站引水系统水力过渡过程研究
5.
Optimization of reservoirs dispatching of Huaguangtan cascade power stations
华光潭梯级水电站水库优化调度探讨
6.
Research & Design of Automatic Generation Control System for Cascaded Hydropower Plant;
梯级水电厂自动发电控制研究与设计
7.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
8.
Study on Optimal Scheduling Model and Algorithm of Cascaded Hydroelectric Power Plants;
梯级水电站优化调度模型与算法研究
9.
The Short-term Optimal Scheduling of Hydro Power Systems with Cascaded Reservoirs;
梯级水电系统短期优化调度问题研究
10.
The bidding model of cascaded hydropower stations considering reserve service in day-ahead market;
考虑备用的梯级水电站日前竞价模型
11.
Optimal operation of cascade hydropower plants in competitive electricity market;
梯级水电厂日竞价优化运行方式研究
12.
The Study and Application for Optimal Operation Chart of Cascade Reservoirs
梯级水电站群优化调度图研究及应用
13.
Discussion on the short-term weekly optimal scheduling of cascade hydropower stations
梯级水电站短期周优化调度规律探讨
14.
Aseismatic Safety Analysis of the Cascade Hydroelectric Power Stations on the Lower Jinsha River
金沙江下游梯级水电站抗震安全分析
15.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
16.
Study on Short-term Operation Scheduling of "One-reservoir and Multi-cascade" Hydroelectric Stations;
“一库多级”式梯级水电站群短期优化调度研究
17.
Short-term Optimal Scheduling of Head-dependent Cascaded Hydropower Stations
考虑水头影响的梯级水电站群短期优化调度
18.
Research on the Real-time Hydrologic Regime Forecasting Management System of Cascade Hydropower Stations
流域梯级水电站实时水情预报管理系统研究