说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电站厂房坝段
1.
Study on Water Seal Layout at the Power House Monolith Joint of Power Station in River Channel;
河床式水电站厂房坝段横缝止水布置形式研究
2.
Three-dimensional Seepage Analysis of Powerhouse Dam Section of Xixia Institute Anti-regulation Reservoir
西霞院水库电站厂房坝段三维渗流计算分析
3.
Finite Element Analysis of the Earthquake Resistance for the Riverbed-Hydropower Station
河床式水电站厂房坝段三维有限元抗震分析
4.
Dynamic Character Research and Earthquake Resistance Anlysis of the Plant Monolith in River Channel;
河床式水电站厂房坝段动力特性研究及抗震分析
5.
3D Finite Element Analysis of House-dam Block of Tuka Hydro-project and the Use of Genetic Algorithm in Stability Analysis of the Dam with Deeply Buried Slip Pathes;
土卡河水电站厂房坝段三维有限元分析及遗传算法在深层抗滑稳定性分析中的应用
6.
Analysis of rapid construction thermal control plans of RCC power house dam section of Jinanqiao hydropower station
金安桥水电站碾压混凝土厂房坝段快速施工温控方案分析
7.
This paper carries on the3 D finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of Huang River as the carrier.
以黄河上游拟建的某灯泡贯流式水电站为载体,对厂房坝段整体进行了三维有限元结构分析。
8.
Study on Dynamic Characteristics and Monitoring of Large-size Power-house of Power Station at Dam Toe;
大型坝后式电站厂房动力特性及动力监测研究
9.
Study on the Dynamic Characteristics of Supporting Composite Construction for Power Station at Dam Toe;
坝后式水电站厂房机墩组合结构动力特性研究
10.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam
向家坝水电站右岸地下厂房帷幕灌浆试验
11.
Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station
向家坝电站地下厂房系统洞室开挖方法
12.
Major technical problems on design of TGP dam and powerhouses
三峡工程大坝及电站厂房设计中的主要技术问题
13.
Three-dimensional FEM Analysis and Back Analysis for Deformation Monitoring of Ertan Hydropower Station Chambers
二滩电站坝肩厂房三维有限元分析及围岩变形观测反分析
14.
Stability and Risk Analysis of Powerhouse Slope of Nanya River Yaoheba Hydroelectric Station;
南桠河姚河坝水电站厂房高边坡稳定及风险分析
15.
Study on Construction Simulation and Optimization for the Underground Powerhouse System of Xiangjiaba Hydropower Station;
向家坝水电站地下厂房系统施工仿真与优化研究
16.
Study on curtain grouting scheme and technology for construction of underground powerhouse on right bank of Xiangjiaba Hydropower Station
向家坝水电站右岸地下厂房施工帷幕灌浆方案与技术研究
17.
KEY CONTROL TECHNOLOGIES OF EXCAVATION BLASTING VIBRATION FOR UNDERGROUND POWERHOUSE OF XIANGJIABA HYDROELECTRIC STATION
向家坝电站地下厂房开挖爆破振动控制关键技术
18.
Analysis on Construction Difficulties of High Slope Excavation at Intake of Underground Powerhouse at Xiangjiaba Hydropower Station
向家坝电站地下厂房进水口高边坡开挖施工难点剖析