1.
Study on the Delay of Construction Project Planning;
建筑工程工期延迟的原因与对策研究
2.
Specification for winter construction of building engineering
建筑工程冬期施工规程
3.
Electronic Engineers
《电子工程师》(期刊)
4.
How to Control the Construction Limit Time for a Highway or Municipal Project;
在高速公路工程施工中如何确保工期
5.
Construction and fit-out work entered its most intensive phase during the year.
年内,建造工程及装修工程进入顶峰期。
6.
Engineering Insurance and the Construction Project Put Scheduled Time Risk Administration into Practice
工程保险与建设工程实施期风险管理
7.
The untimely death of the engineer delayed the completion of the project.
工程师的过早去世推迟了工程的完工期。
8.
Spin out a project indefinitely
无限期地延长一项工程
9.
electrical term maintenance contract
电力工程定期维修合约
10.
The first phase (stage) of the infrastructure project
基础设施工程第一期
11.
Anticipated date of taking over of the project
预计工程验收交接日期
12.
They are called Sunday engineers.
他们被为星期日工程师
13.
Many engineers volunteer to work here on sunday.
很多工程师星期天自愿来这里工作
14.
Its length determines the duration of the project.
它的长度就是确定工程任务的工期。
15.
The first phase of the project was completed two months ahead of schedule.
第一期工程提前两个月完工。
16.
Analogy system for controlling quality time cost of construction projects
工程项目质量工期费用控制模拟系统
17.
THE PROJECT COST-TIME OPTIMIZATION GRAPHICAL METHOD
工程计划成本—工期最优化的图示方法
18.
Research on Noise Barrier Engineering Supervision in Freeway Construction Phase;
高速公路施工期声屏障工程监理研究