1.
Analysis on River Bed Evolution of Gezhouba Reservoir Since the Starting of Three Gorges Project
三峡工程动工来葛洲坝水库河床演变分析
2.
INFLUENCE OF FLOOD DISCHARGE AND SAND SCOURING OF THREE GORGES RESERVOIR AND GEZHOUBA RESERVOIR ON DEFORMATION OBSERVATION AT YICHANG SEISMOSTATION
三峡与葛洲坝水库泄洪冲沙对宜昌台形变观测的干扰
3.
Influence of Riverbed Evolution of the Lower Reach of the Three Gorge Project on the Channal Analyzed from Downstream Bed Erosion of Danjiangkou and Gezhouba Reservoir
从丹江口、葛洲坝水库下游河床冲刷看三峡工程下游河床演变对航道的影响
4.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
5.
China Gezhouba Construction Group Corp.
中国葛洲坝水利水电工程集团公司
6.
Technical innovations of Gezhouba Group in construction of hydropower engineering
葛洲坝集团在水电施工中的技术创新
7.
Research of Anti-abrasion of Turbine's Blades of Gezhouba Hydropower Station
葛洲坝水电站水轮机叶片抗磨蚀的研究与防护
8.
A Study on the Resistance Against Abrasion for the Sluice Buildings of Gezhouba Project
葛洲坝工程泄水建筑物抗冲耐磨试验研究
9.
Structural Static and Dynamic Analysis on GEZHOU Dam Hydropower Generator Units;
葛洲坝水轮机组结构的静力与动力分析研究
10.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
11.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
12.
Some Problems on Observation Design of Vertical Displacement at the Gezhouba Large Dam
葛洲坝水利枢纽大坝垂直位移观测设计的几个问题
13.
ON THE APPLICABILITY OF THE RIVER NETWORK STORAGE METHOD TO MEDIUM TERM HYDROLOGICAL FORECASTING DURING THE CUTOFF PERIOD FOR THE KUO CHOU BA HYDRAULIC AUTHORITY
论河网蓄水量法作葛洲坝水利枢纽截流期中期水文预报的适用性
14.
Both Gezhouba Project and Three-gorges dam are built in Yichang.
葛洲坝工程和三峡大坝都处在宜昌。
15.
AUTOMATIC UPLIFT PRESSURE MONITORING SYSTEM AT GEZHOUBA ERJIANG SPILLYWAY &. TRIAL OPERATION ANALYSIS
葛洲坝二江泄水闸扬压力自动化系统及试运行分析
16.
Numerical Simulation of Navigable Flow Conditions and Development of Shippings Dispatching System for the Three Gorges & Gezhouba Projects;
三峡葛洲坝通航水流数值模拟及航运调度系统研究
17.
Study on Influence of Three Gorges Project on the Navigation of Gezhouba Project and Yichang River Reach and Its Measurement;
三峡蓄水运用对葛洲坝通航与宜昌河段的影响及对策研究
18.
The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法