说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 开挖方案
1.
The Slope of Guishan Stability Analysis and Optimization Comparison of Several Excavation Programs;
龟山滑坡体稳定分析及开挖方案优化
2.
Optimization of the Structual Design and the Excavation Scheme of Road Tunnel;
公路隧道结构设计方法及开挖方案的优化
3.
STUDY ON BLASTING METHOD OF EXCAVATION OF TUNNEL WITH VARIETY TERRANE THROUGH BIG-SPAN THIN-DOVER
大跨度超浅埋复杂岩层隧道爆破开挖方案研究
4.
Study on Excavation Scheme Comparison and Construction Mechanics of Highway Tunnel Extension
公路隧道扩建开挖方案比选及施工力学研究
5.
Non-blasting Excavation Method with Expanding Agent Used in Shenzhen Metro Tunnel Construction
深圳地铁隧道施工的膨胀剂非爆破开挖方案
6.
Cost Analysis on the Transport Program for Excavating a Narrow-Bore Tunnel
小型断面隧道开挖运输方案成本分析
7.
Computer Simulation on Deformation of Round Rock in Tunnel Excavating and Research on Support Technology;
巷道开挖围岩变形计算机模拟及支护方案研究
8.
The Construction Method Proposal Study on the Excavation and Supporting & Protection Works for Powerhouse of Liuhong Hydropower Station;
柳洪电站主副厂房开挖与支护施工方案研究
9.
Simulation on different excavation construction of the shallow-buried tunnel under the uneven rock pressure
浅埋、偏压隧道开挖施工方案的仿真分析
10.
Study of Feedback Optimizing and Analyzing the Schemes of Excavation and Supporting of Large Cavern Group Using Integrated Intelligent Method;
大型洞室群开挖与加固方案反馈优化分析集成智能方法研究
11.
Design of Deep Foundation Pit Excavation Construction Scheme of the Lotus Road Large Underground Parking Area of Macao
澳门莲花路大型地下停车场深基坑开挖施工方案设计
12.
Research on Geologic Problem and Countermeasure of Foundation Pit for a Excavation Project in Xi'an City
西安市某项目基坑开挖的工程地质问题及解决方案
13.
Research on the Construction Schemes of Metro Station Driven with Enlarging Shield Tunnels;
盾构扩挖修建地铁车站施工方案研究
14.
Case Base Maintenance Based on Data Mining;
基于数据挖掘的案例库维护方法研究
15.
Building Data Mining Solutions with SQL Server 2000;
基于SQL SERVER 2000的数据挖掘方案研究
16.
Exploring Files of Higher Vocational Colleges,Serving Local Development
挖掘高职院校档案,综合服务地方发展
17.
Integrated Earthing Design Schema for Open-digged and Shield-digged Tunnel
明挖、盾构隧道综合接地设计方案研究
18.
In the paper, the design of dewatering and drainage by pipe well point method for deep foundation pit excavation of a metro station in Shenzhen city is presented.
主要介绍了深圳地铁×车站深基坑开挖所采用的管井井点降水方案的设计情况。