说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 进洞方案
1.
Tunneling Scheme for Bias Pressure Section of Right Line Tunnel Exist
桃墅岭隧道右线出口偏压段进洞方案
2.
Study on Schemes of Tunnel Portal at Landslides of Mountain Expressway;
穿越滑坡体的山区高速公路隧道进洞方案研究
3.
Plan design of portal excavation with semi-open and semi-underground method and the construction of Longjing tunnel
龙井隧道半明半暗进洞方案设计与施工
4.
Treatment Program for Deformation and Landslides at Left Entrance of Zhenbao Tunnel
镇保隧道左幅进口洞口段变形及坍方处治方案
5.
On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine
双护盾全断面掘进机(TBM)遇软岩洞段的解困方案
6.
Portal Design and Construction Plan of Highway Tunnel in Mountain Area Based on New Concept of Environmental Protection
基于环保新理念的山区公路隧道进洞设计与施工方案
7.
Discussion on the Construction Scheme of Tunnel Entrance in Crowded Population Area
隧道洞口位于人群聚居区出洞施工方案探讨
8.
Safety Precaution during Swinging Erection of Dayandong Megabridge
大岩洞特大桥转体安全措施方案设计
9.
The ripping scheme and construction method of Jiaokou tunnel No.3 transverse gallery
交口隧道3号横洞挑顶方案和施工方法
10.
Design plan of water-conveying tunnel in high-side pad road foundation and its construction measures
高垫方路基内输水隧洞的设计方案和施工措施
11.
Combined Mid-level Continuing Education Programme
合并中级进修教育方案(中进方案)
12.
Full-section Tunnel Construction Technique in Rock Masses and Its Support Alternatives;
岩体全断面隧洞施工技术及支护方案研究
13.
Analysis and Research on the Scheme of Right-bank Flood Discharge Grotto in GongBoXia Hydro-power Station;
公伯峡水电站右岸泄洪洞方案分析及研究
14.
Plan Design of the Supervisory Control System in LongDong Hydro Station and Development of Its LCU;
龙洞电厂监控系统方案设计及其LCU研制
15.
Wind tunnel study on wind loads of a membrane structure roof of a stadium;
青岛体育中心膜顶结构方案风荷载风洞实验
16.
Optimization of Construction Scheme of Group Tunnels with Small Spacing
小间距群洞施工影响效应方案优化研究
17.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
18.
Research on Design Optimization of Construction Method in Entrance of Foling Long and Large Tunnel
佛岭长大隧道洞口段施工方案优化研究