1.
Methods for Avoiding Problems in Third-class Medical Appliance Maintenances Station
三级检修站发展中存在的问题及改进方法
2.
Experiment on shutting of emergency overhaul gate in surge shaft of Tianshengqiao cascade II hydropower station
天生桥二级水电站事故检修闸门动水下门试验
3.
The overhaul mode research and information management of two hydropower stations in Ge Zhou Ba-the Three Gorges;
葛洲坝和三峡电站检修模式研究及其检修信息管理
4.
Development and Design of 3D Simulation System of Power Station Equipment Main tenance based on 3D Solid Works
电站设备检修三维仿真系统的开发与设计
5.
Transferring from Traditional Substation Maintenance to Condition-based Maintenance of Digital Substation
传统变电站检修向数字化变电站状态检修转变
6.
National Supervision and Inspection Center for Explosion Protection and Safety of Instrumentation (NEPSI)
国家级仪器仪表防爆安全监督检验站
7.
Repair the last level of magnifier of Y-output in HH4311A oscillograph;
HH4311A型示波器Y输出末级放大器的检修
8.
Transport Operation and Management among Three Kinds of Railway Container Terminals;
三级铁路集装箱站点运输组织的研究
9.
Numeric simulation of three-dimensional turbulent flow in three-stage circulating mixed-flow pump in nuclear power plant
核电站三级循环混流泵的三维湍流数值模拟
10.
Effectiveness of the Minuteman II Stage III Refurbishment Program
民兵II三级整修计划的有效性
11.
Improve the Repair Stations Dealing with Faults 70 t Class Truck Repair Facilities and Faults Countermeasures
提高站修所处理70t级货车故障及施修的几点对策
12.
The Course and Simple Analysis of Twice Transformations for Xiaodongjiang Hydropower Station s Service and Seepage Drainage Systems;
小东江水电站检修、渗漏排水系统改造分析
13.
RCM on Substation Equipment of Nuclear Power Station Research and Application
RCM在核电站变电设备检修中的研究与应用
14.
"Three-step"concept of Overhauling Marketization in Waterpower Enterprises;
对水电企业检修市场化的“三步走”构想
15.
Establishment and Implementation of Common Maintenance of the Three Gorges Power Plant
三峡水轮机常规检修流程制定与实施
16.
The spiral case disk shaped drain valve joystick fracture repair of Three Gorges Hydropower Station
三峡电站蜗壳盘形排水阀操作杆断口修复
17.
Unit Maintenance Scheduling Model Ander Primary Electricity Market Environment;
初级电力市场环境下机组检修计划的实用模型
18.
Studies on the Jilintai First Class Power Station s Shot Firing Aggregate in Triaxial Test;
吉林台一级水电站爆破堆石料的三轴试验研究