说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 洞室群
1.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
2.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
3.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
4.
Research for Mesh Generation of Finite Element Methods for Underground Cavity Group;
地下洞室群有限元网格剖分方法研究
5.
Modeling and Simulation for the Traffic and Transportation System of Underground Structure Group;
地下洞室群交通运输系统建模与仿真
6.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究
7.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
8.
Elementary Seismic Analysis of Underground Hydropower Cavern Groups
水电站地下洞室群地震反应初步分析
9.
SCIENTIFIC DISCOVERIES OF JINXIU-HUANGYAN PANLONGDONG ANCIENT UNDERGROUND CAVE GROUP AND PRELIMINARY ANALYSES;
锦绣黄岩蟠龙洞古地下洞室群的科学发现及初步分析
10.
Surrounding Rock Stability Analysis of Xiaowan Hydropower Project Underground Powerhouse Chambers
小湾水电站地下厂房洞室群围岩稳定分析
11.
Stability Analysis on Adjoining Rock of Large-scale Underground Chamber Group of Suofengying Hydropower Station
索风营水电站大型地下洞室群围岩稳定分析
12.
Engineering Geological Study on the Stability of Rock Mass Surrounding Large Scale Underground Caverns;
大型地下洞室群围岩稳定性工程地质研究
13.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
14.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
15.
Stability Analysis on Underground Caverns of Pumped Storage Hydropower Station;
抽水蓄能电站地下厂房洞室群围岩稳定性分析
16.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
17.
Study on Work Behavior of Large Scale Underground Caverns of Hydroelectric Project;
大型水电工程地下洞室群工作性态研究
18.
Study on Calculation Method and Effectiveness of Control of Seepage in Surrounding Rock Masses of Underground Hydropower Station Openings;
地下厂房洞室群渗流计算方法与渗控效果研究