1.
Application of Orifice-closed Grouting Method in Low-pressure Non-cover-weight Grouting for Yanshan Reservoir
孔口封闭灌浆法在燕山水库低压无盖重灌浆中的应用
2.
Application of sealed orifice grouting in seepage elimination project at Fengman dam
孔口封闭灌浆法在丰满大坝降渗工程帷幕灌浆中的应用
3.
THE APPLICATION OF GROUTING METHOD BY REMOVING DANGER AND REINFORCING PRESSURE IN MIDDLE\SMALL-SIZED RESERVOIRS;
中小型水库除险加固压力灌浆法的应用
4.
Application of packed grouting method for dealing with the homogeneous soil-dam cracks
充填式灌浆法在处理均质土坝裂缝中的应用
5.
TEST STUDY ON GROUTING TREATMENT OF CAVITY UNDER BRIDGE END TRANSITION SLAB BASED ON PWD
基于FWD检测的公路桥台搭板脱空灌浆法处理
6.
Line Meter (m) and Grout Take (t) method were taken successively for measurement of grouting quantity in China.
我国灌浆工程的工程量主要采用灌浆孔进尺(延长米,m)和灌浆注入量(t)两种方法计量。
7.
Grouting of GIN method is a new grouting technigue which is adopted in many countries in recent years.
GIN法灌浆是近年来国际上推行的一种灌浆新技术。
8.
Grouting for Water Blocking in Tunnel with HSC New Grouting Material
浅谈采用HSC新型灌浆材料进行隧洞阻水灌浆的方法
9.
The underwater grouting and plugging consolidation disposal measures on drainage pipe culverts in Dashahe Reservoir;
放水涵管水中灌浆封堵加固处理方法
10.
The Use of Consolidation Grouting in Reforcing Subgrade;
论固结灌浆方法在加固路基中的应用
11.
The application of post-injecting method in bored pile engineering
后注浆法在钻孔灌注桩工程中的应用
12.
Evaluate the Dam Foundation Grouting Effect of the Guangzhao Hydropower Station
用达标法和对比法评价光照电站坝基灌浆效果
13.
Application of one-way grout injection method in contact grouting of Laxiwa hydropower project
单向注浆器法在拉西瓦水电站接触灌浆工程中的应用
14.
In this paper, the handle methods for extruding glue into cracks are introduced in detail, and the evaluation method for the glued cracks is provided as well.
本文对裂缝灌浆施工方法作了详细的介绍,并给出了裂缝灌浆效果评价方法。
15.
Application of the Way of Trying Pressure in Earth-fill Dam Splitting Grouting of Shiba Reservior
试压法在石坝水库坝体劈裂灌浆中的应用
16.
Study on Test Facility of Differential Water Pressure Test in Grouting Engineering;
灌浆工程微分压水试验法试验装置的研制
17.
Study on Grouting Pressure and Its Stabilization Controlling Method in Fractured Rock Mass;
裂隙岩体灌浆压力及其稳定性控制方法研究
18.
Working Method of Handling Water Conservancy Spillway Crack by Grouting with Pressure;
使用压力灌浆处理溢洪道裂缝的施工方法