1.
Treatment of Cracks on Runner Blade of Turbines In Tianshengqiao Hydropower Station
天生桥一级电站水轮机转轮裂纹处理
2.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
3.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
4.
Hydro-power Project of First Level in Pingnan, Fujian Province;
福建省屏南县后垄溪一级水电站工程
5.
Study on Stability of Approach Channel Slope for Jinping I Hydropower Station
锦屏一级水电站引渠边坡稳定性研究
6.
The conduction and damming current planning choice and the construction of Jilintai the first level hydroelectric power station
吉林台一级水电站导截流设计及施工
7.
Study on Short-term Operation Scheduling of "One-reservoir and Multi-cascade" Hydroelectric Stations;
“一库多级”式梯级水电站群短期优化调度研究
8.
Hongjia Ferry hydropower station is a tap station of wujiang River step exploitation in Guizhou province.
洪家渡水电站是贵州省乌江梯级开发的一个龙头电站。
9.
Research on Slope Stability of Intake Slope on Right Bank of Jinping Ⅰ Hydropower Station;
锦屏一级水电站右岸进水口边坡稳定性研究
10.
Stability Analysis on Ⅳ-Ⅳ Slope of Jinping Ⅰ Hydropower Station;
锦屏一级水电站Ⅳ-Ⅳ山梁边坡稳定性分析
11.
Studies on the Jilintai First Class Power Station s Shot Firing Aggregate in Triaxial Test;
吉林台一级水电站爆破堆石料的三轴试验研究
12.
Study on the Stability of the Spandrel Groove High Slope of Jinping Hydroelectric Power Station;
锦屏一级水电站拱肩槽边坡稳定性研究
13.
Study of the Problem about Hydrogeochemisty of Jingpin Hydroelectric Power Station;
锦屏一级水电站坝区水文地球化学问题研究
14.
Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;
天生桥一级水电站溢洪道掺气减蚀研究
15.
On tender document consultation for the first-cascade Jinping hydropower project;
锦屏一级水电站工程招标文件咨询的几点体会
16.
Discussion about the Management of Jilintai-ⅠHydropower Station;
关于吉林台一级水电站工程管理的探讨
17.
Investigation of Zooplanktons in the Areas of Jinping Hydroelectric Station Before the Building of the Reservoir;
锦屏一级水电站建库前的浮游动物调查
18.
Role of Jinping I Hydropower Station upon Social and Economic Development of Sichuan;
锦屏一级水电站对四川社会经济发展的作用