1.
Analysis of and counter-measures for vertical cracks commonly seen in piers and abutments;
墩台常见的竖向裂缝原因分析及对策
2.
Assigns According to the Rigidity Coupling Model Analysis Platform Longitudinal Force
按刚度耦合模型分析墩台纵向力分配
3.
The high pier construction method and control measures of highway bridge
公路桥梁高墩台施工方法及控制措施
4.
Application of Combined Dolphins in Design of Piers under Large Level Force
大水平力作用下组合墩台在引桥墩设计中的应用
5.
Simulation on Coupled 3D-Vibration Model of Railway Bridges and Condition Assessment of Piers and Abutment;
铁路桥梁三维耦合振动仿真与墩台状态评估
6.
Study on Horizontal Displacement of Bridge Pier and Abutment in Deep Silt Stratification Areas;
厚淤泥层地区桥梁墩台的水平位移研究
7.
Influence on Main Arch Ring of Bridge Abutment Horizontal Displacement and Arch Axis Deformation;
墩台水平位移和拱轴线变形对主拱圈的影响
8.
Fuzzy Comprehensive Judgment for the Stability of Piers and Abutments that Built on a Hill
山坡上墩台基础稳定性的模糊综合评判
9.
The Setting out of the Curve Pier Platform Central and the Bearing Reserved Hole of Straight Beam
曲线桥墩台中心及直梁支座预留孔的测设
10.
Built on sheer mountain ridges, it has perfect defense works formed by watchtowers, battlements, barracks, and etc.
城墙建在陡峭山脊之上,敌楼墩台、边城掩体,水关烟墩等形成了完备的军事防御体系。
11.
The pedestal, plinth, or base of a pillar, column, or statue.
基脚;墩柱墩、柱石或雕像的台架、侧石或基石
12.
The Analysis of Main Pier Platform's Heat of Hydration of Babaaoyue Bridge
巴巴奥约河大桥主墩承台水化热分析
13.
A platform or mound of earth within a fort from which guns are fired over the parapet.
炮墩,炮座堡垒内部的平台或土墩,大炮可从中越过胸墙而发射
14.
A series of arches supported by columns, piers, or pillars.
拱形建筑物由柱、桥墩或台柱支撑的一系列拱
15.
On height computation method of pile type bridge pier and ribbed plate type abutment post
桩柱式桥墩、肋板式桥台柱顶高程计算方法
16.
A Study on Displacement of Pile Near the Abutment and the Subgrade Construction of Deep Soft Soil Foundation at Bridge-Head;
深厚软基上桥梁近台墩桩位移问题研究
17.
The Research on Structure Analysis of Construction Platform of Deep-water Pier and Construction Technology;
深水墩施工平台结构分析及其施工技术研究
18.
Research into Construction Control of Long-span Beam Bridge with High Pile-Cap and Deepwater Pier;
大跨高桩承台深水墩梁桥施工控制研究