1.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
2.
Comprehensive Construction Technique Study and Analysis in the Condition of Complicated Geology of Diversion Tunnel with Extra-large Section;
复杂地质条件下特大断面导流隧洞综合施工技术研究与分析
3.
Key Techniques for Arched Heading Excavation of Large-cross-section Loess Tunnels
大断面黄土隧道弧形导洞法施工关键技术研究
4.
Advance Bottom Heading Technology Applied in Hard Rock Mountain Tunnels with Large Cross-section
下导洞超前施工技术在大断面山岭硬岩隧道中的应用
5.
The Design and Application of the Movable Steel Mould Plate used in the Tunnels with Outsized Sections;
特大断面隧洞钢模台车的设计和应用
6.
Numerical simulation of preliminary lining of large section crossing tunnels constructed with PBA method
洞桩法大断面群洞交叉隧道初衬数值模拟
7.
Landslide Management Technologies for Hydraulic Tunnel with Large Section in Shatter Layer;
破碎地层大断面水工隧洞塌方治理技术
8.
Grouting Construction Technology of Long Hydraulic Tunnels with High Crustal Stress and Large Cross-sections
高地应力大断面特长水工隧洞灌浆施工技术
9.
Comprehensive entering into tunnel construction technology of large section weak surrounding rock tunnel
大断面软弱围岩隧道综合进洞施工技术
10.
In some cases, work on the main tunnel progresses a few meters behind the pilot tunnel so that the latter provides ventilation, always a major problem in tunneling operations.
有时,主隧道的掘进紧跟在导洞掘进后面几米,由导洞提供通风。通风一直是隧道掘进中的大问题。
11.
In many projects, like the Simplon, for example, a small pilot tunnel is driven before the full diameter of the tunnel is excavated.
在许多隧道工程中,经如辛普龙大隧道,都要在隧道全面开挖前打一个导洞。
12.
Study on Technology System of Zero Cave-entrance and Its Application of Large Cross-section Tunnel under Complex Geological Conditions
复杂地质条件下大断面隧道“零”进洞工法技术体系及应用研究
13.
Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel
双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究
14.
Application of New Austrian Tunneling Method to construction of diversion tunnel for Dalong Water Control Project
新奥法在大隆水利枢纽工程导流隧洞施工中的应用
15.
Construction diversion tunnel(in combination with tailrace tunnel) design of Xiluodu Hydropower Station
溪洛渡水电站导流隧洞(与尾水洞结合段)设计
16.
Discussion on application of tunnel boring machine(TBM) to construction of water conveyance tunnel
浅议全断面隧洞掘进机在引水隧洞施工中的应用
17.
Rheology Model Identification about Longtoushan Large Section of Highway Tunnel
龙头山特大断面公路隧道流变模型辨识(英文)
18.
Full-section Tunnel Construction Technique in Rock Masses and Its Support Alternatives;
岩体全断面隧洞施工技术及支护方案研究