说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工方案优化
1.
Discussion on Optimization of Reconstruction Plan for K440 Substation in Huaihua Railway Terminals
浅谈怀化枢纽K440所改造施工方案优化
2.
Optimum Research on Bracing Design and Construction Schemes for Deep Foundation Pits;
深基坑支护设计与施工方案优化研究
3.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
4.
Research on Design Optimization of Construction Method in Entrance of Foling Long and Large Tunnel
佛岭长大隧道洞口段施工方案优化研究
5.
Optimization of double multi-arch tunnel construction plan for rampart protection
考虑古城墙保护的连拱隧道施工方案优化
6.
Optimizing Construction Schemes for Lower Cross Beam of Main Tower of Changshou Yangtze River Bridge in Chongqing
重庆长寿长江大桥主塔下横梁施工方案优化
7.
OPTIMUM ANALYSIS OF CONSTRUCTION SCHEME OF MULTI-ARCH TUNNEL WITH EIGHT TRAFFIC LANES
双向八车道连拱隧道施工方案优化分析
8.
Public Works Construction Projects to Optimize the Construction Technology Program
市政工程建设项目施工技术方案优化
9.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
10.
Dezhou IP Network Improvenment Project Implementation Plan;
德州IP城域网二期优化工程实施方案
11.
The Preliminary Design Plan Optimization Analysis During YiBao(Yilan-baoqing) Highway Construction
依宝公路施工初步设计方案优化分析
12.
Study on Reparation Designs Optimization of Tunnelling in Soft Surrounding Rock
软岩隧道施工变形修复方案优化研究
13.
The Optimizing Project of Construction Network in Time-cost Algorithm of Engineering;
工程施工网络计划中工期-成本优化方案
14.
Period Optimization Scheme Determination of Building Engineering Construction Network Plan
建筑工程施工网络计划工期优化方案的确定
15.
To Optimize the Construction Method for Tack laying of Chengdubei Marshalling Yard Using Value Engineering
应用价值工程优化成都北编组站轨道施工方案
16.
Optimum Decision-Making of Deep Foundation Pit Construction Project Based on the Least Variance Priority Method
深基坑支护施工方案最优化决策方法研究
17.
Plan optimization for digitalization design of mine construction drawings based on AutoCAD system
基于AutoCAD的矿山施工图数字化设计方案优化
18.
EXPLORATION ON OPTIMIZATION OF ADIT SCHEME FOR SIZEHE TUNNEL AND ITS CO NSTRUCTION SITUATION
寺则河隧道辅助坑道方案优化及施工情况探讨