1.
Simulation Change of Temperature and Stress Field Analysis in a Massive Concrete Sluice Pier;
基于ANSYS的混凝土闸墩温度场及应力场仿真分析
2.
Effect of Cooling Pipe Measure on Temperature Control and Anti-cracking of Concrete Pier
混凝土闸墩施工期冷却水管温控防裂效果分析
3.
The prestressed concrete floodgate pillar may simplify the structure of buildings, to shorten the use of steel largely and to make the construction conveniently, Therefore it is used more and more popularly.
预应力混凝土闸墩可以简化建筑物结构、节省大量钢筋和方便施工,因此被越来越多地采用。
4.
Construction Temperature Observation and Back Analysis of Pier-wall C25 Concrete for Caojie Sluice
草街冲砂闸闸墩C25混凝土施工温度观测反分析
5.
Influences of Water-Seal Position on Pier Stress of Concrete Gravity Dam
混凝土重力坝止水位置对闸墩应力的影响研究
6.
Quantitative Analysis of the Main Factors of Vertical Concrete Cracks in Some Sluice Pier in the Northern Jiangsu Plain
苏北平原某水闸闸墩混凝土开裂主导因素的定量分析
7.
Cause Analysis and Reinforced Structure Safety of Cracks of Concrete Piers of Overflow Dam
混凝土溢流坝闸墩裂缝成因分析及加固后安全评价
8.
reinforced concrete hollow pier
钢筋混凝土空心桥墩
9.
ANALYSIS OF THE ULTIMATE LOAD CAPACITY OF CONCRETE-FILLED STEEL TUBULAR BRIDGE PIER
钢管混凝土高桥墩的极限承载力分析
10.
Construction technology for adjustment of 1750 t concrete box pier top deviation
1750t混凝土箱梁墩顶偏差调整施工工艺
11.
On control of temperature cracks on large volume thin-wall pier concrete
大体积薄壁墩混凝土温度裂缝的控制
12.
Large mass concrete construction technology of pier digging well foundation
桥墩挖井基础大体积混凝土施工技术
13.
The Control of Concrete Quality of Liujia Daokou Regulating Sluice Project;
刘家道口节制闸工程混凝土质量控制
14.
Discussion of Plan for Massive Concrete Placing of Pump Gate Floor
泵闸底板大体积混凝土浇注方案讨论
15.
The Applications of the Concrete Hydraulic Gate of CFC
复合碳纤维筋混凝土水工闸门的应用
16.
Analysis of the Causes of Reinforced Concrete Cracks of Water locks and Their Prevention
水闸钢筋混凝土裂缝成因分析与预防
17.
Research of pier foundation on cohesive soil
黏性土地基混凝土墩式基础工作机理试验研究
18.
OPTIMUM DESIGN OF CONCRETE ANCHORAGE IN HOT OIL PIPELINE
埋地原油热输管线中混凝土固定墩的优化设计