1.
Implement of controlling the working point of fiber interferometer by closed loop with LabVIEW;
基于LabVIEW光纤干涉仪闭环工作点控制系统
2.
Reliability and Validity of Work Locus of Control Scale;
工作控制点量表(WLCS)的信效度研究
3.
Some Keypoints in Controlling Construction Cost at the Bidding Stage of Quantity List Evaluation;
工程量清单招投标阶段工程造价控制工作重点
4.
The Tache and Job Outline of Building Construction Cost Control;
建设项目造价成本控制环节及工作要点
5.
The Relationship of Medical Staff s Job Burnout with Type A Personality and Locus of Control;
医护人员工作倦怠与A型人格、控制点的关系研究
6.
Set point controlling of mechanically pumped cooling loop
机械泵驱动两相冷却系统工作点温度控制
7.
Study on Key Point Control of Sanitation Disposal at Frontier Ports
浅析口岸卫生处理工作中的关键点控制
8.
The Relationship between Job Stress and Job Performance and the Mediation to This Relation Ship from Locus among Teachers in Universities;
高校教师工作压力、控制点及其与工作绩效的关系研究
9.
piping and instrument diagram
带控制点工艺流程图
10.
Identify the 'Tracked' shpe's control point by entering it's row number within the controls section of the shape sheet.
在形状工作表的控件区段内输入其行号,找到“被跟踪”形状的控制点。
11.
Mediating Role of Control Locus in Teachers' Job Burnout and Their Job Stress Coping Strategiesl in Colleges and Universities
控制点在辅导员工作压力应对策略和职业倦怠间的中介作用
12.
Optimization of quality cost becomes a new reference point to make decisions on inspection plan.
控制与优化质量成本将作为制定工序检验计划的一个新的参考点。
13.
Internal Audit is the Point of Emphasis of Internal Control System in Modern Enterprise;
内部审计工作是现代企业内部控制制度的着重点
14.
The text describes the trait and work principle of the electric control of far-infrared fruit and vegetable drier.
介绍远红外果蔬干燥机电气控制的特点及工作原理。
15.
Mainly described are the working principles and structure features of the number marking device for the computer-controlled signal board.
主要介绍了微机控制标志板打号机的工作原理及结构特点。
16.
The Establishment of Working Control Points in Surface Mine by EDM Polar Coordinate Method and its Accuracy Analysis
用测距极坐标法建立露天矿工作控制点及其精度分析
17.
High precision robust servo controller design based on a multi-operating point model
基于多工作点模型的高精度鲁棒伺服控制器设计
18.
A Brief Discussion about Effects of Forward Moving of Quality and Technology Control Points based on Payload Operational Condition
从载荷工况出发浅析质量技术控制点前移的作用