1.
Seismic Design and Performance of Rehabilitated Steel Moment Connections for an Existing Steel Building in Kaohsiung City
高雄市既存钢造建筑物梁柱接头耐震补强设计及行为
2.
The lowermost part of an entablature in classical architecture that rests directly on top of a column.
楣梁,柱顶过梁古典建筑中上横梁的最低部分,直接置于柱头上
3.
connecting the crossbeam to the apex of a triangular truss.
连接大梁和三角孔桁梁顶点的支柱。
4.
FINITE ELEMENT ANALYSIS OF BEAM-TO-COLUMN CONNECTION WITH CANTILEVER BEAM BOLTED-SPLICING
带悬臂梁段拼接的梁柱连接有限元分析
5.
Robot welding of beam column connection of steel structures in Japan
日本钢结构柱梁连接处的机器人焊接
6.
The pollen is shed directly on the stigma.
花粉直接散落在柱头上。
7.
starter terminal stud
起动机线头接柱螺栓
8.
Hysteretic Behavior on the Strengthen of Beam-to-column Joint in Column-tree Moment-resisting Frame;
树状柱钢框架中梁柱连接节点加强的滞回性能
9.
The cross-piece is mortised into the upright post.
横梁和立柱是用榫眼接合一起的.
10.
Behaviour of Semi-Rigid Beam-to-Column Minor Axis Connections in Steel Frames;
钢框架梁柱弱轴半刚性连接性能研究
11.
The Analysis of Seismic-Resistant Behavior of Beam-to-Column Web Rigid Connections in Steel Moment Frames;
钢框架梁柱腹板性连接抗震性能分析
12.
Behavior of Rigid Beam-to-column Connection with T-stub;
T形件连接的梁柱刚性节点性能分析
13.
Elastic-plastic analysis of steel frame with beam-column semi-rigid connections
梁柱半刚性连接的钢框架非线性分析
14.
Study on Anti-Seismic Performance Testing of New Type Beam-to-Column Connections in Steel Frames
框架刚性连接梁柱节点抗震性能研究
15.
Research on the behavior of beam-to-column web connection in dog-bone style
弱轴连接的梁柱狗骨式节点性能研究
16.
Welding residual stresses of cover-plate retrofitted steel moment connections
梁柱刚接节点盖板加固的焊接残余应力分析
17.
Shear capacity of connections of post-casted beams connected on existing concrete columns
既有柱后接梁连接的抗剪承载性能试验研究
18.
junction block insulator terminal
接线块绝缘线头接柱螺栓