说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> X型宽尾墩
1.
Study on Combined Energy Dissipator with X-Shape Flaring Gate Pier in Shatuo Hydropower Station;
沙沱水电站X型宽尾墩联合消能工的研究
2.
Research on Hydraulic Characteristics of Different Faring Gate Piers;
不同体型宽尾墩的水力特性比较研究
3.
Optimal experimental study on flaring piers of surface spillways in high arch dam
高拱坝表孔宽尾墩体型优化试验研究
4.
Study test on combined energy dissipator of flaring pier and flip bucket
T型宽尾墩+消力戽(池)联合消能工试验研究
5.
Application of new type flaring gate pier at Lidi hydropower project
新型坎式宽尾墩等在里底水电站中的应用研究
6.
Numerical Simulation on United System of Flaring Gate Peers, Stepped Spillway and Stilling Pool;
宽尾墩和阶梯溢流坝一体化数值模拟
7.
The Construction Technology of the Dam Flaring Piers by Using Slip-forms of Jufudu Hydropower Project
居甫渡水电站大坝宽尾墩滑模施工技术
8.
Application and understanding of flaring gate pier joint energy dissipater with low-middle water head
中低水头宽尾墩联合消能工的应用与认识
9.
Skimming Flow Pressure Characteristics on Joint Energy Dissipation of Stepped Dam-face & Flaring Gate Piers
与宽尾墩联合使用的台阶面水流压强特性研究
10.
Test and Study of Influence of Length of a Flaring Pier Plunge Pool on Energy Dissipating Effect
宽尾墩消力池池长对消能效果影响的试验研究
11.
Experimental Investigation on Energy Dissipation by Flaring Gate Piers on Spillways and Slit-Type Bucket on Bottom Level Outlets in High Arch Dams;
高拱坝表孔宽尾墩—深孔窄缝挑坎联合消能试验研究
12.
Aeration of skimming flow on stepped spillway combined with flaring gate piers
与宽尾墩联合使用的阶梯溢流面水流掺气问题研究
13.
Research on Hydraulic Characteristics of Energy Dissipation with Flaring Gate Piers and Stilling Pool in Riverside Spillway
岸边溢洪道中宽尾墩—消力池消能的水力特性研究
14.
Model Test and Investigation on Draft Tube Mid-pier Modification of the Qingtong-Gorge Hydropower Station;
青铜峡水电站尾水管中墩改造结构模型试验与计算研究
15.
Setting an instrument frustum in a semi-subterranean hole to reduce environmental affecting
用微型地下室坑式摆墩方式解决BBVS-60宽频带地震计零漂问题
16.
Overall dimension(LxWxH)
硫化机外形(长x宽x高)
17.
Research on Optical and Conductivity Properties of p-type Conducting CuAl_(1-x)Fe_xO_2 with Wide Band Gap
p型宽带隙半导体CuAl_(1-x)Fe_xO_2的光电性能研究
18.
The second temporary pier was such that its legs straddled the width of the pier.
第二临时墩的立柱间距超过桥墩的宽度。