说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 土石方工程
1.
Study on Optimal Deployment of Construction Equipment in Earthwork;
土石方工程中装运机械配置方案优化研究
2.
On earthwork design in equestrian place for Asian Games in Guangzhou
浅谈广州亚运会马术比赛场土石方工程设计
3.
Research on the Quantity Calculation and Balance Allocation Planning of the Earth-rock Work in Hydropower Project;
水电工程土石方工程量电算及平衡调配规划研究
4.
Construction of Environmental Prevention Measures In Gz New TV Station Project
广州电视台新址项目基坑支护及土石方工程的施工环保措施
5.
Application of grid method in the large earthwork--Taking our new campus construction for example;
方格网法在大型土石方工程中的应用——以我校新校区建设为例
6.
Research and Analysis on Blasting Program of The Relocation of Heavy Steel Leveling of Earth and Stone Works Project
重钢搬迁项目平基土石方工程标段爆破方案探析
7.
Standard for measurement of earthworks and stoneworks in dredging engineering
疏浚工程土石方计量标准
8.
Approach To Random Simulation Methed about Construction Process of High Earth Rockfill Dams
高土石坝施工过程随机模拟方法探讨
9.
The measurement of the earth and stone works in the budget estimate of municipal engineering
市政工程概预算中的土石方正确计量
10.
Brief talk on the influence of subgrade earthwork construction method on project cost
浅谈路基土石方施工方法对工程造价的影响
11.
Initial analysis on composite disposition of the highway project earthwork construction machine
浅析公路工程土石方施工机械的组合配置
12.
Large-diameter longhole blasting was used to excavate soil-rock in some engineering project.
某工程的土石方开挖采用大直径深孔爆破方式。
13.
Research on Soil and Water Conservation of Oil Pipeline Project;
石油管道工程水土保持调查及方案设计
14.
Experience summary of phase Ⅰ of earth and rock work for Yangjiang Nuclear Power Plant
阳江核电厂土石方一期工程设计经验总结
15.
Road Earthwork Distribution and Cost Computation
公路工程土石方调配及造价计算的探讨
16.
Experimental Research on Clay Concrete and Its Applying Used as a New Material for Earth Dam Anti-seepage Wall;
土石坝防渗墙粘土混凝土材料研究与工程应用
17.
The Project Design for Preserving Soil and Water in Oil Pipeline Construction--Taking Nanning-Baise Processed Oil Pipeline Project for Example
石油管道类工程建设水土保持方案设计——以南宁—百色成品油管道工程为例
18.
This project involved 400000 cubic metres of earthwork.
这项工程要挖40万土方。