1.
TRB mode analysis of metro vehicles in Shenzhen Metro Phase 1
深圳地铁一期工程地铁车辆TRB模式分析
2.
It is mainly introduced the protection configuration and the concerted relationship for the power supply system of Shenzhen metro vehicles at the 1(superscript st) stage.
主要介绍了深圳地铁一期工程牵引供电系统保护配置及配合关系。
3.
A probe into auditing methods of working plan budget of civil worksfor Shenzhen Metro Phase 1;
关于深圳地铁一期土建工程施工图预算审计方法的探讨
4.
Proposals of Home-manufactured Vehicles, Mechanical & Electric Equipment in Shenzhen Metro;
深圳地铁一期工程车辆及机电设备国产化方案探讨
5.
Indoor room air quality in waitingroom of Shenzhen railway station
深圳市一期地铁站厅室内空气质量分析
6.
Study on Dichophase Project Financing Mode of Shenzhen Metro Line 4;
深圳地铁4号线二期工程项目融资模式研究
7.
Fireproof design of metro vehicle for Shenzhen Metro Line 1 express
深圳地铁一号线增购项目车辆的防火设计
8.
Design of Architectural Scheme of Taoyuan Station on No.1 Line of Shenzhen Metro
深圳地铁一号线续建桃园站建筑方案设计
9.
Application of CFG pile on the No.3 line of Shenzhen subway
CFG桩在深圳地铁3号线中的应用
10.
On Shield Method Construction Techniques of Shenzhen Metro Crossing-railway Interval Tunnel
深圳地铁穿越铁路的区间隧道盾构法施工技术
11.
Research on Deformation Rule of Deep Excavation with Top-down Construction Method in Shenzhen-metro Laojie Street Station;
深圳地铁老街站逆作法深基坑变形规律研究
12.
Meanwhile, Shenzhen Metro sinks more than 0.1 billion RMB to create an obstacle-free system for the disabled, solving the problem of going to WC.
同时,深圳地铁投资一亿多元打造了残疾人无障碍系统,解决了坐地铁上厕所难的问题。
13.
The Discussion of Rational Eexploitation Strength in the Plot around the Metro Station: Start ing with the Detailed Plan of Rail Transport in Second Phase in Shenzhen;
地铁车站周边地块合理开发强度之初探——由深圳市轨道交通二期工程详细规划说起
14.
A Technique of Forming Dent into Rock Layer for Underground Diaphram Wall
深圳地铁福民站地下连续墙入岩成槽技术
15.
Construction and cost analysis of underground continuous wall beneath Fumin station of Shenzhen Metro;
深圳地铁福民站地下连续墙施工及成本分析
16.
Construction of Underground Diaphragm Wall in HUAXIN Station of SHENZHEN Metro
浅谈深圳地铁华新站地下连续墙施工技术
17.
Study on Tunnel Piston Wind in Shenzhen Metro Xiangmihu Island Station;
深圳地铁香蜜湖岛式车站的隧道活塞风研究
18.
Finite Element Analysis on the Retaining Structure Architectural Structure of Foundation Pit in the LuoHu Station of the ShenZhen Metro;
深圳地铁罗湖站基坑支护结构体系有限元分析