说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 暗挖段
1.
Construction Techniques for Double-layer Undermining Entering Hole in the Subway Main Body
地铁车站主体双层暗挖段进洞施工技术
2.
On construction technique of metro tunnel of subsurface excavation through building group
穿楼房群地段暗挖地铁隧道施工技术
3.
Research on Temperature Control for Crack-Resistance and Crack-Control of Buried Culvert in Open-Cut Section of the Ancient Canal Junction
古运河枢纽明挖段暗涵的防裂限裂温度控制研究
4.
A period of darkness and gloom.
一段黑暗阴暗的时间
5.
Research of Quality Control for Shallow Underground Excavation in the Underground Culvert Project at the West Fourth Ring
西四环暗涵工程浅埋暗挖工法质量控制研究
6.
Analysis of Space-time Effect for Displacement Relief of Strata Induced by Excavation Process of Shallow Embedded Tunnel;
浅埋暗挖隧道开挖引起地层变位时空效应分析
7.
The Construction Techniques Study on Large-span Box Tunnel by Shallow Excavation;
浅埋暗挖大跨箱型隧道施工技术研究
8.
Undermining Construction Technique Research on Suzhou Street Subway Station of Beijing City;
北京地铁苏州街站暗挖施工技术研究
9.
Undermining Construction Technique Research on Dongwuyuan Subway Station of Guangzhou City
广州地铁动物园站暗挖施工技术研究
10.
The Study on Construction Techniques of Undermining the Multiple Risky Points Subway
多风险点地铁暗挖区间施工技术研究
11.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
12.
Construction Techniques for the Control of the Settlement in Urban Shallow Tunnels
城市浅埋暗挖隧道施工沉降控制技术
13.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
14.
On the Application of the Method of Undercutting with Shallow Overburden to Long-spanned Tunnels
浅埋暗挖法在大跨隧道中的应用探讨
15.
Mechanical Analysis of Support Mechanism of Shed-Pipe Grouting Technology for Tunneling Construction in Shallow-Buried Soft Stratum
浅埋暗挖隧道管棚支护机理力学分析
16.
Numerical simulation of underground excavated tunnel construction of adjacent structure
邻近建筑物的暗挖隧道施工数值模拟
17.
Environmental effects of excavation of the Beijing west-fourth ring underground tunnel project for the South-North Water Diversion
南水北调中线西四环暗涵工程暗挖施工对环境的影响研究
18.
Construction of Box Culvert Excavation of Shallow Surface Subsidence Monitoring Data Analysis and Data Mining
箱涵浅埋暗挖施工地表沉降监测资料分析与数据挖掘