说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地铁暗挖
1.
The Study on Construction Techniques of Undermining the Multiple Risky Points Subway
多风险点地铁暗挖区间施工技术研究
2.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
3.
Study on Ground Deformation Effect Caused by Tunneling Construction
地铁暗挖隧道施工地面沉降预警值研究
4.
On common diseases of secondary lining of subway's subsurface tunnel and their control
地铁暗挖隧道区间二衬施工通病与控制
5.
On construction technique of metro tunnel of subsurface excavation through building group
穿楼房群地段暗挖地铁隧道施工技术
6.
Undermining Construction Technique Research on Suzhou Street Subway Station of Beijing City;
北京地铁苏州街站暗挖施工技术研究
7.
Undermining Construction Technique Research on Dongwuyuan Subway Station of Guangzhou City
广州地铁动物园站暗挖施工技术研究
8.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
9.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
10.
Study on the Ground Surface Settlement of Large-span Metro Tunnel with Shallow-buried Tunneling Method;
浅埋暗挖大跨度地铁隧道地表沉降分析
11.
On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station
浅埋暗挖地铁车站地表沉降及既有线变形分析
12.
Study on Surface Settlements Induced by Bored Shallow Tunneling of Subway
地铁区间浅埋暗挖施工的地表沉降特征
13.
Design of Metro Running Tunnel in Soft Fluidity Plastic Ground
软流塑地层浅埋暗挖法地铁隧道设计与分析
14.
Application of New Austrian Tunnelling Method to Beijing Sub-way Construction
浅埋暗挖技术在北京地铁建设中的应用
15.
Underground Excavation Conversion Technology for Entering Main Construction through Subway Large Adit
地铁特大风道进主体暗挖施工转换技术
16.
The construction technology bury shallow and dig invisible of the station of Chongwenmen of 5th line of the underground in Peking
北京地铁五号线崇文门站浅埋暗挖施工技术
17.
Three-Dimensional Numerical Simulation and Analysis on Caven-PBA Method for One Shallow Metro Station in Shenyang;
沈阳某地铁车站浅埋暗挖洞桩法三维数值分析
18.
Study on Design and Technology for Building Subway Station with Tunneling and Top-down Method;
地铁车站暗挖逆筑法设计施工技术研究