1.
Discussion of Plan for Massive Concrete Placing of Pump Gate Floor
泵闸底板大体积混凝土浇注方案讨论
2.
Precast concrete blocks are made by pouring unset concrete into a mold and allowing it to harden.
混凝土砌块是将拌合好的混凝土浇注在模子中,养护至凝固而制成。
3.
concreting boom
浇注混凝土起重机臂
4.
A mold for the setting of concrete.
模板浇注混凝土的模板
5.
"In autumn, 3 m of rough concrete work was completed in the east tube per week."
秋季在东孔每周完成浇注混凝土3米。
6.
The concrete pump is only relocated after a number of sections have been completed.
浇注完数段路面板后,才移动混凝土泵。
7.
The Pouring Stabilization of the Fly Ash Aerocrete Block Production
粉煤灰加气混凝土生产的浇注稳定性
8.
"In the anhydrite zone,given a 3 m thick Base, 5m3 of concrete is installed in the Base and 4 m3."
在硬石区,3米厚的基底浇注混凝土5立方米,拱穹浇注混凝土4立方米。
9.
after a certain proportion of the concrete has been poured. The top level must be poured within twenty minutes of the pouring of the bottom level to assure proper bonding.
在浇注底层混凝土后20分钟以内须浇注面层混凝土以保证粘接牢固。
10.
After the first casting, the deflection can be checked and modified using shim plates.
第一次浇注混凝土后,挠度可用垫片调整。
11.
The steamroller levelled off the gravel roadbed and then the concrete was poured.
蒸汽压路机压平碎石路基,然后浇注混凝土。
12.
Application Study of Gussasphalt Concrete on Pavement of Long Span Steel Deck
大跨径钢桥面浇注式沥青混凝土铺装应用研究
13.
The influence of cast mold in rebound testing of concrete compressive strensth
浇注模板对回弹法检测混凝土抗压强度的影响
14.
Methods and Research on Deterioration of Steel Deck Gussasphalt Concrete Pavement;
钢桥面浇注式沥青混凝土铺装病害分析及对策
15.
Application Technique for Long Span Steel Deck Gussasphalt Concrete Pavement;
大跨径钢桥面浇注式沥青混凝土铺装技术研究
16.
feeding control case for depositing and mixing of concrete
混凝土浇灌给料控制箱
17.
concrete placement systems & equipment
混凝土浇灌系统与设备
18.
cast-in-situ concrete construction
现浇钢筋混凝土施工