说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 通航水流条件
1.
Study of navigation flow condition for Xiafu Hydraulic Complex
下福水利枢纽工程通航水流条件研究
2.
Research on Flow Condition for Navigation in the Entrance Area and the Transitional Reach of the Navigation Structures;
通航建筑物口门区及连接段通航水流条件研究
3.
Flow conditions and improvement measures in Goupitan hydro-power station downstream
构皮滩枢纽下游通航水流条件及改善措施
4.
Study on Navigation Condition of Down-stream Channel of Dajiang Lock of Gezhouba Project
葛州坝大江船闸下游航道通航水流条件试验研究
5.
Study of Influences of Reservoir Regulation on Navigation Flow Condition between Cascade Hydraulic Projects;
水库调节对枢纽间河道通航水流条件的影响研究
6.
Application of 1D and 2D coupled mathematical model in navigation flow condition of hydro-junction
一、二维耦合数学模型在水利枢纽通航水流条件研究中的应用
7.
The Research on Influence of Peaking Operation of TGP Hydropower Station in Flood Period on the Upstream Navigation Conditions;
三峡工程电站汛期日调节对上游通航水流条件的影响研究
8.
Numerical Simulation of Navigable Water Conditions at the Transshipment Terminal of Xiangjiaba
向家坝转运码头港区通航水流条件数值模拟和分析
9.
The Experimental Study on the Effect of the Continuous Bends Flow to Navigation
连续弯曲航道水流条件对通航影响的试验研究
10.
Navigation condition and navigation safety at bridge district of mountainous rivers
山区河流桥区通航条件和通航安全问题研究
11.
Numerical Calculation and Experiment on the Unsteady Flow and Navigation Condition in the Long-tail Channel of Powerstation
电站长尾水渠非恒定流数值计算分析及通航条件研究
12.
Test on navigation condition influenced by the angle between approach channel and main channel
引航道与河流主航道的夹角对通航条件影响试验
13.
Specifications for water passage components of hydraulic turbines
GB/T10969-1996水轮机通流部件技术条件
14.
Analysis of Flow Condition at the Entrance of Approaching Channel by Open-type Partition Dikes;
透空隔流堤对船闸引航道口门区水流条件影响研究
15.
Tests on Improving Flow Conditions at the Entrance of Approaching Channel by Diversion Pier;
导流墩改善船闸引航道口门区水流条件的试验研究
16.
Influence on deposition of Three Gorges Reservoir caused by change of operation regulation
蓄水方案变化对三峡水库泥沙淤积及通航条件的影响
17.
Test Study on Flow Conditions at Water Intake of Power Station at Shihutang Navigation-power Junction
石虎塘航电枢纽工程电站取水口水流条件试验研究
18.
On the relationship between maintenance condition of Yangtze Estuary deepwater channel and water & sediment transport from the valley
关于长江口深水航道维护条件与流域来水来沙关系的初步分析