说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 二级泵站
1.
Analysis on Claim;
万家寨引黄工程总干线一、二级泵站防火喷涂项目索赔分析
2.
Analysis on the Observation Data of Groundwater Level of Secondary Pumping Station on South Main Line of YRDP (Yellow River Diversion Project)
引黄工程南干线二级泵站地下水位观测资料分析
3.
Research on Optimal Operation of Multistage Pumping Stations in Donglei Ⅱ Yellowriver Puming Irrigation Project;
东雷二期抽黄梯级泵站优化调度研究
4.
Dsign Research on Overall Structure of ErJiba Pumping Station of South-to-North Water Diversion Project
南水北调二级坝泵站主厂房混凝土整体结构设计研究
5.
Research on Comparation and Selection of the Projects of Bulp Through-flow Pump Sets, and Test of Set-up Model Pump System at Erjiba Pump Station of the South-to-north Water Diversion Project
南水北调二级坝泵站贯流式水泵技术方案比选和装置模型试验研究
6.
Study on the Seal Property of the Second Seals of Reactor Coolant Pump in Nuclear Station from Contacting to Non-contacting Mechanical Seal
流体静压式核电站主泵二级密封由接触式到非接触式转变的密封性能分析
7.
Research on Operation Management and Energy Saving Measures of High-lift Step Pump Station
高扬程梯级泵站运行管理与节能措施
8.
Research on Operation Scheduling in Multi-stage Pumping Stations by Computer Simulation;
梯级泵站运行调度的计算机仿真研究
9.
Marine Engine Design of Two-stage Relay Pumping Station for 2 060 kW Dredger ship
2060kW疏浚船—两级接力泵站轮机设计
10.
In the light of characteristics of south-to-north water transfer project in the east of China, the requirements of step pump stations of the project for pump units are analyzed.
针对南水北调东线工程特点,分析了其梯级泵站对主泵机组的要求。
11.
Study on the appraisal indices of the technique management for large step pumping stations of South to North Water Transfer Project
南水北调梯级泵站技术管理评价指标研究
12.
Several Problems about Step Pump Stations in Eastern Route South-to-North Water Transfer Project
南水北调东线工程梯级泵站的几个问题
13.
Study on Optimum Operation of Multistage Pumping Stations Based on the Genetic Algorithm;
基于遗传算法的梯级泵站优化运行研究
14.
Study on Optimal Multi-stage Pumping Operation Models in Large-Scale Water Transfer Project;
大型引水工程梯级泵站优化调度模型研究
15.
Construction of manual digging concrete pile in dormitory building works of the grade one pumping station located in the main canal transferring of Yellow River diversion project
引黄总干一级泵站宿舍楼人工挖孔灌注桩施工
16.
Numeric simulation of three-dimensional turbulent flow in three-stage circulating mixed-flow pump in nuclear power plant
核电站三级循环混流泵的三维湍流数值模拟
17.
Differences between Reactor Coolant Pumps Used in Qinshan Phase II NPP Project and Daya Bay NPP
秦山核电二期工程主泵与大亚湾核电站主泵的差异及其影响
18.
Application of Double-tube High-pressure Directional Jet Grouting Technique in Construction of Hongqi Reservoir Pumping Station
二管法高压定喷截渗技术在泵站建设中的应用