说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 悬臂施工阶段
1.
Stress Analysis on Stages of Cantilever Canstruction of Large-Span Continuous Beam Bridges
大跨度连续梁桥悬臂施工阶段的应力分析
2.
Stress monitoring analysis in the construction period of the continuous beam bridge cantilever
连续梁桥悬臂施工阶段的应力监测分析
3.
Space-stress Analysis of the Continuous Rigid Frame Bridge at the Cantilever Construction Stage
连续刚构桥悬臂施工阶段空间应力分析
4.
The Buffeting Response Analysis of Curved Long Span continuous Rigid Frame Bridge in Cantilever Construction Stage;
高墩大跨曲线连续刚构桥最大悬臂施工阶段抖振响应分析
5.
Simulation Analysis and Curing Effect Research of Curved Continuous Rigid Frame Bridge during Cantilever Construction;
曲线连续刚构桥悬臂施工阶段的仿真分析及弯曲效应研究
6.
Wind Load Analysis of the Maximum Cantilever in Construction Periods of High-Rise Cap Continous Rigid Frame Bridge
高桩承台连续刚构桥最大悬臂施工阶段风荷载分析
7.
Risk Assessment and Risk Management for Cantilever Cast Pre-stresed Concrete Continuous Bridge during Construction Stage;
悬臂浇筑预应力混凝土连续梁施工阶段风险评估和风险管理
8.
Hanging Basket Pouring Method in the Cantilever Section Construction of the Hanjiang West Creek Bridge
韩江西溪特大桥悬臂段挂篮悬灌法施工技术
9.
Key Technology in Construction Control of Curved Bridge by Sectional Cantilever Form Traveler
曲线桥梁分段悬臂挂篮施工控制关键技术
10.
Self-anchored Suspension Bridges Key Construction Phases Analysis and Investigation;
自锚式悬索桥关键施工阶段分析与研究
11.
Construction Control of Long Span Suspension Bridges During Erecting Stiffening Girders
大跨悬索桥加劲梁吊装阶段的施工控制
12.
Mechanical behavior of steel truss bridge stiffened with rigid cables in construction stage
刚性悬索加劲钢桁梁桥施工阶段力学性能(英文)
13.
The Construction Technique of Prestress Concrete Continuous Box Beam Close-up Section
悬臂浇筑预应力混凝土连续箱梁合拢段的施工技术
14.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
15.
Research on Cast-in-Place Cantilever Construction Technology of Cable-Stayed Truss Bridge
斜拉桁架桥的悬臂浇注施工工艺研究
16.
Application of the Kalman′s Filtering Method to the Suspension Bridge Construction Control the Main Cable Erecting
卡尔曼滤波法应用于悬索桥施工控制——主缆架设阶段
17.
Study on Three-Dimensional Flutter Analysis in Frequency-Domain of Suspension Bridges and Their Flutter Stability When Erection;
悬索桥的三维颤振频域分析及其施工阶段颤振稳定性研究
18.
Construction Simulation Computation and Analysis for Suspended Steel Truss Bridge;
钢桁加劲梁悬索桥施工与成桥阶段仿真计算分析