1.
Demolition of an 80m reinforced concrete chimney by direction blasting
80m高的钢筋混凝土烟囱定向爆破拆除
2.
DEMOLITION OF ALUMINA STORAGE BY DIRECTIONAL BLASTING IN COMPLICATED ENVIRONMENT
复杂环境下氧化铝储槽定向爆破拆除
3.
DEMOLITION OF A 210M-HIGH REINFORCED-CONCRETE CHIMNEY BY DIRECTIONAL BLASTING
210m钢筋混凝土烟囱定向爆破拆除
4.
The technique of directional demolition blasting of a tall frame-structured reinforced concrete tower is introduced.
介绍了高耸框架结构的定向爆破拆除方法。
5.
THE REASON OF BACK BEARING PILLAR ABRUPTION IN A HIGHER POSITION IN DEMOLITION OF FRAME BUILDINGS BY DIRECTIONAL BLASTING
框架楼定向爆破拆除中后柱高位拉断原因
6.
Application of Multi-direction Collapse in Explosive Demolition of Complex Special-shaped Structure
多向倒塌技术爆破拆除复杂结构楼房
7.
Saftey regulations for explosive demolition
GB13533-1992拆除爆破安全规程
8.
BLASTING DEMOLITION BY TWO-SIDED AND LONGITUDINAL OF THE HIGHEST BRIDGE PIERS IN ZHEJIANG
浙江第一高公路桥墩组的双侧纵向爆破拆除
9.
Analytical solution to the dynamic equation of toppling buildings demolished by blasting
爆破拆除高耸建筑定轴倾倒动力方程解析解
10.
The post-blasting investigation of the effect of blasting indicated that the demolition blasting of the cofferdam was successful.
爆破效果调查表明,此次围堰拆除爆破是成功的。
11.
Study on the Impact of the Stability of Surrounding Buildings under Deep Foundation Support Blasting
深基坑支撑爆破拆除对周围建筑物稳定性的影响研究
12.
This paper introduced the blasting demolition of a strip-shaped base.
介绍了建筑物条形基础的爆破拆除。
13.
Mechanics Analysis on Safety of Demolition of Tall Chimneys by Controlled Blasting;
高耸烟囱爆破拆除安全性的力学分析
14.
Design and construction of structural demolition of a certain power plant;
某电厂结构爆破拆除设计与施工实践
15.
Calculation of the Process of Collapsing Movement of Beam-and-Column Structure in Demolition Blasting
拆除爆破中梁柱结构失稳过程的求解
16.
PRACTICE IN CONTROLLED BLAST REMOVAL OF THE SHANGPAI RIVER BRIDGE
上派河大桥控制爆破拆除的施工实践
17.
Discussion About the Problem of Shearing Point Forward Shiftting During Demolition by Controlled Blasting
控制爆破拆除中转铰点前移问题探讨
18.
DESIGN AND CONSTRUCTION OF A LARGE IRRIGATION AQUEDUCT BRIDGE′S BLASTING DEMOLITION
一大型水利渡槽爆破拆除设计与施工