1.
Variable economical factors in construction of Jiangya dam;
江垭大坝工程施工中变化的经济要素
2.
Discussions on Several Problems of Construction and Design of Jiangya RCC Dam;
江垭碾压砼坝设计与施工中若干问题的探讨
3.
Earthwork Design for Cubic Meter of Earth and Stone in Qingjiang Rockfill Dam Construction;
清江水布垭面板堆石坝动态土石方平衡设计
4.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
5.
Analysis for Danjiangkou dam foundation uplift pressure statistical model
丹江口大坝坝基扬压力统计模型分析
6.
Deformation indices monitoring a dam section of Danjiangkou project
丹江口大坝31号坝段变形监控标的探讨
7.
Analysis on Settlement Abnormity for Fuchunjiang Dam and Inverse Analysis of Rock Mechanical Parameters
富春江大坝沉陷异常分析及坝基力学参数反演
8.
Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam
丹江口大坝加高工程中原坝体裂缝处理工艺
9.
Study on Reinforcement Technology of Earth-Rock Dam of Danjiangkou
丹江口大坝加高工程左岸土石坝加固技术研究
10.
Displacement Back-analysis of Soil Parameters for Shui Bu Ya CFRD;
水布垭面板堆石坝土体参数的位移反演分析
11.
A Toe Board Foundation Treatment of the High Concrete-Faced Rockfill Dam in SHUIBUYA;
水布垭高面板堆石坝趾板基础处理研究
12.
Countermeasure for Resettlement Work of Shuibuya Hydroproject & Realization about It;
水布垭工程坝区移民问题、对策及几点认识
13.
New construction technology for Shuibuya Concrete Faced Rockfill Dam
水布垭高混凝土面板堆石坝施工新技术
14.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
15.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
16.
Huge dams have been build across the river.
横跨大江建起了巨大的水坝。
17.
Analyze on Development Prospects of 300 m Level Ultra-high CFRD from Shuibuya High CFRD
从水布垭高面板堆石坝看我国300m级超高面板堆石坝的发展前景
18.
Analysis on the measured settlement and prediction modeling of statistic settlement of Shuibuya CFRD
水布垭面板坝实测沉降分析与土石坝沉降统计预报模型