说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 评价工作程序
1.
The Study of Hydrotechnic Obstructions Assessment Standard & Assessment Program in Inland River;
内河碍航物碍航评价标准及评价工作程序的研究
2.
Financial Post-evaluation on Energy-saving Project of Alumina Calcination;
氧化铝焙烧工序节能工程财务后评价
3.
qualitative evaluation
定性评价 -程序的
4.
Optimum Sequential Decision-making Method Applied on the Evaluation of Project;
优序法决策在工程项目评价中的应用
5.
Research Evaluation: Characters, Functions, Methodology and Process;
科学研究评价的性质、作用、方法及程序
6.
Introduction to the Basic Process of Talents Cultivation Level Assessment for Higher Vocational Institutions;
高职院校人才培养工作水平评估基本程序简介
7.
On the Legalization, Normalization and Procedure-Developed Trend of Appraisal Work of the Local People s Congress;
论地方人大评议工作的法制化规范化和程序化
8.
Assessment and Evaluation of the Engineering Project Cost of the Construction Enterprises;
施工企业工程项目成本的考核评价工作
9.
The Study on the Using Values,the Working Rules and the Covering Procedure of the Oral History;
口述史的应用价值、工作规范及采访程序之讨论
10.
Evaluation Staff
评价工作人员(组)
11.
Economic evaluation program of generation projects based upon Excel together with its succeeding research functions;
基于Excel的发电工程经济评价程序及其后续研究功能
12.
program evaluation and review technique (PERT)
计划估评法;程序鉴定技术;程序评价和检查技
13.
aluation and review technique (PERT)
计划估评法;程序鉴定技术;程序评价和检查技术
14.
Make work assignments to appropriate personnel, establish procedures to be followed and review completed work.
进行部门人员工作分配,建立需遵循的程序并评估完成的工作。
15.
Found a New Way of Working Procedure for Value Engineering--The Foundation of Parts Route And Function Route;
创建价值工程工作程序新路径——零件路线与功能路线的设立
16.
Review on Post-evaluation for Comprehensive Effectiveness of Forestry Ecological Engineering;
林业生态工程综合效益后评价工作研究进展
17.
hought of Post-Evaluation in China s Forestry Engineering;
关于开展林业重点工程后评价工作的思考
18.
Risk analysis and post assessment of resettlement for water project construction;
水利工程移民安置工作的风险分析与评价