说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 硬岩掘进机
1.
Study on Drive System of the Full-face Rock Tunnel Boring Machine;
全断面硬岩掘进机(TBM)驱动系统的研究
2.
Application of EBZ200H Hard Rock Boring Machine in Peigou Coal Mine
EBZ200H硬岩掘进机在裴沟煤矿的应用
3.
Finite element analysis of pick and holder on hard rock roadheader
硬岩掘进机截齿与齿座的有限元分析
4.
Research and Application of Refit Technology of All-Section Rock Tunnel Boring Machine
全断面硬岩掘进机全面整修技术研究与应用
5.
Application on the construction technology of machine driving to the hard rock for 200m every month
硬岩机掘月进200m施工技术的应用
6.
On construction of TBM machine in tunnel
浅谈硬岩双护盾掘进机(TBM)隧洞施工
7.
Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel
双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究
8.
Middle-Deep Bore Blasting Experimental Study on Hard Rock Tunnel Heading
硬岩巷道掘进的中深孔爆破试验研究
9.
Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;
敞开式全断面岩石掘进机连续掘进原理的研究
10.
Application of Combined Slotting in Driving Hard Rock Roadway
混合掏槽技术在坚硬岩石巷道掘进中的应用
11.
The Use and Improvement of MK3--the First Stone Drift Driving Machine in China;
国内首台MK3岩巷掘进机的使用与改进
12.
Investigation of rock cutting mechanism of disc cutter of fullface development machine
全断面岩石掘进机盘形滚刀破岩机理的探讨
13.
Research of the Vibration Velocity Attenuation Law of the Particle in Wall Rock Bursting Where Hard Rock Tunneling Advances Rectangularly
硬岩爆破掘进对直角拐弯后巷道围岩中质点振速衰减规律的研究
14.
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;
岩石掘进机隧道管片衬砌的结构分析
15.
Improvement of Blating Hole Arrangement and Explosive Charge Volume of Hard Ductility Rocks in the Roadway Excavation at Jinshan Gold Mine
金山金矿硬韧性岩巷道掘进炮眼布设和装药量的改进
16.
Improvement on Material Conveying System of Model TB880E Full-face Rock TBM
TB880E型全断面岩石掘进机材料运输系统的改进
17.
Study on the Continuous Boring Control System of Open Type Full Face Rock Tunnel Boring Machine;
连续掘进敞开式全断面岩石掘进机控制系统的研究
18.
Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;
铁路软岩隧道臂式掘进机主机架力学特性分析