1.
The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;
Chardara水电站泄洪消能模型试验研究
2.
Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
高坝大流量泄洪消能数值模拟及实验研究
3.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
4.
Discussion on energy dissipation design for hydropower station at high head and large discharge
大流量高水头水电站泄洪消能设计的探讨
5.
Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程混凝土施工管理
6.
Safety management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程安全管理
7.
Control of explosion in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程爆破施工控制
8.
Management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程管理综述
9.
Experimental Study on Scheme of Energy Dissipation of Discharge Structures of Laodukou Hydropower Station
老渡口水电站泄洪消能方案模型试验研究
10.
Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
中小型拱坝表孔大流量泄洪消能建筑物体形研究
11.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
12.
Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工
13.
Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;
高拱坝坝身泄洪与消能建筑物的优化布置
14.
Research on Barrage Effect for Level Rotary Internal Energy Dissipation Discharge Tunnel;
水平旋流内消能泄洪洞的阻塞效应研究
15.
Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel;
水平旋流内消能泄洪洞水力特性的数值模拟
16.
Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel with Shaft Inlet
竖井进流水平旋转内消能泄洪洞的数值模拟
17.
The study of the thin-arch-dam layout for flood spillway and the effect of energy dissipation
薄拱坝坝身泄洪布置及消能效果的研究
18.
The trajectory bucket is improved and optimized for suitable trajectory distance and small scouring.
泄洪洞挑流坎挑流消能时,当泄流量较小时,挑距较短。