1.
Analysis of residual bearing capacity of concrete arch bridge in service by finite element method
混凝土拱桥剩余承载能力有限元分析
2.
Research on Bearing Capacity and Durability of Existing RC Bridge Based on Performance Deterioration of Reinforcement
基于钢筋工作性能劣化的既有RC桥梁剩余承载能力及耐久性研究
3.
Assessment of Bridge Residul Resistant In-Service Concrete Bridges
现役混凝土桥梁剩余承载力评估研究
4.
Experimental study on residual shear capacity of existing corroded RC beams
既有锈蚀RC梁剩余抗剪承载力试验
5.
Research on Temperature Distribution and Mechanical Behavior of the Column Reinforced by Inner Circular Steel Tube during and after Fire
钢骨混凝土核心柱温度场及高温后剩余承载力性能研究
6.
Time-Dependent Reliability-based Assessment of Bridge Residul Resistant;
基于时变可靠度的桥梁剩余承载力评估
7.
Study on Residual Bearing Capacity Evaluation Mode of Reinforced Concrete Rib Arch Bridge
钢筋混凝土肋拱桥剩余承载力评价模式研究
8.
EXAMINATION TECHNIQUE AND EVALUATION OF BEARING CAPACITY FOR A DAMAGED RIBBED SLAB STONE ARCH BRIDGE
病害板肋石拱桥检测技术与剩余承载力评估
9.
Analysis on Residual Bearing Capacity and Reliability Index of Reinforced Concrete Member after High Temperature;
高温后钢筋混凝土构件剩余承载力与可靠性指标分析
10.
RESIDUAL STRENGTH OF CONCRETE-FILLED DOUBLE-SKIN STEEL TUBULAR STUB COLUMNS AFTER EXPOSURE TO FIRE
中空夹层钢管混凝土轴压短柱火灾后剩余承载力的试验研究
11.
Analysis of the Residual Capacity of 32m Box Girders for Passengers-oriented Railways Damaged at Wartime
铁路客运专线32m箱梁战时破损后剩余承载力分析
12.
Can Services Shoulder the Burden of Absorbing the Surplus Labour Force in China s Rural Areas?;
服务业能承担转移我国农村剩余劳动力的重任吗
13.
A residual-loading-capacity-based ant colony system for the vehicle routing problem with simultaneous delivery and pickup
基于剩余装载能力的蚁群算法求解同时送取货车辆路径问题
14.
Study of Welding Residual Stresses on Carrying Capacity of the Cold-Formed Medium Column;
焊接残余应力对中厚壁冷弯方矩管柱承载力性能研究
15.
The Study on Influence of Residual Stress on Bearing Capacity of T-Type CHS Joints
残余应力对T型圆管相贯节点承载力性能影响研究
16.
carrying capacity [transportation]
载货量,承载能力,运载能力 [运输]
17.
Parametrization Study on Redundant Bearing Capacity of Portal Crane with Double Lever Jib
四连杆组合臂架门座起重机富余承载能力参数化研究
18.
Research on Parametric Calculation in Residual Loading Capacity for Double-Link-Bar Jib of Portal Crane
四连杆组合臂架门座起重机富余承载能力的参数化研究