1.
On Radication of r-sum of the First and the Last Circulant Matrices;
关于r-首尾和循环矩阵的开平方运算
2.
United Nations Pacific Energy Development Programme
联合国太平洋能源开发方案(太平洋能源方案)
3.
It is planned that the industrial area will cover 9.97 square km is developed in the first phase.
园区规划面积9.97平方公里,首期开发1平方公里。
4.
Pacific Energy Development Programme
太平洋能源开发方案(能源方案)
5.
My usual chair had been moved from its usual place.
我平常用的椅子已从老地方移开了。
6.
What kind of peaceful means? ``One country, two systems'' and ``joint development''.
什么样的和平方式?“一国两制”,“共同开发”。
7.
Both sides should begin anew the quest for peace.
双方都应重新开始寻求和平。
8.
It is easier to regain your balance in the open stance.
在开方式步伐中你的平衡更容易保持。
9.
The Study of Mining Method the Water Body for South 2 Mining Area;
大平矿南二采区水体下开采方案研究
10.
The J2EE Open Source Technology Solution for Electronic Commerce Platform Abstract;
电子商务平台的J2EE开源解决方案
11.
Research on the Design Method for STEP-Compliant Open CNC Platform;
STEP-Compliant开放式数控平台设计方法研究
12.
Analyses and Compare on the Level of Financial Openness;
金融开放水平测度方法的评述与比较
13.
CAI Multimedia Courseware Development Tools and Selection Scheme;
CAI多媒体课件开发平台及选择方案
14.
The Design Principles and Methods of Horizontal Well Development in Jianghan Oilfiled
江汉油区水平井开发设计原则与方法
15.
Analysis of U-Boot and Method of Its Porting on YLP2410 Platform
U-Boot分析与移植到YLP2410开发平台的方法
16.
One trusted software constitution environment based on aspect-oriented programming
一个面向方面的可信软件开发平台TSCE
17.
Development Method of Information System Based on .NET Platform
基于.NET平台的信息系统开发方法
18.
The Method of Selecting and Scheduling Product Platform Development Project
产品平台开发项目的选择和规划方法