1.
Application of CFD in Primary Sedimentation Tank;
计算流体力学(CFD)在初沉池中的应用
2.
The trickling filter and activated sludge efficiencies cited required primary sedimentation and effluent circulation.
列举的生物滤池与活性淤泥法的效率就需要初次沉淀和回流。
3.
Study on Phosphorus Behavior between the Sediments and Overlying Water in Dianchi Lake;
滇池沉积物与上覆水之间磷的行为规律的初步研究
4.
Old, dark sleepy pool
古老的,沉寂的池面
5.
sediment space
沉淀空间(蓄电池的)
6.
Effective measures to promote the efficiency of tube settler;
改善斜管沉淀池沉淀效果的工程措施
7.
The control on Dianchi Lake pollution reaps preliminary fruit.
滇池污染治理初见成效。
8.
A TEST OF CONTINUOUS SEDIMENTATION - STUDY ON THE SETTLING PERFORMANCE IN A SECONDARY CLARIFIER
连续流沉淀试验——二次沉淀池运行工况的研究
9.
tube (plate)settler
异向流斜管(或斜板)沉淀池
10.
Code for design of sand basin of water conservancy and hydropower projects
水电水利工程沉沙池设计规范
11.
chain for sink stoppers, lavatory cisterns, etc., of iron or steel
链,用于上沉器,洗涤池等,钢或铁制
12.
Summary on 180 dia seamless open caisson construction technologies at Baotou Steel
包钢φ180无缝旋流沉淀池施工技术总结
13.
EVOLUTION OF THE SEDIMENTATION AND TECTONICS OF LATE PALEOZOIC DANCHI BASIN
丹池晚古生代盆地的沉积和构造演化
14.
A Study of Modeling Experiments of the New High Effective Rotational Flow Grit Chamber;
新型高效旋流沉砂池的模型试验研究
15.
Study on Test of Settling Basin for Oncomelania Snail and Drawing Water in Middle-level Project;
沉螺池和中层取水工程措施试验研究
16.
The Research of the Main Physical and Chemical Characteristics of Modern Sediment in Dianchi Lake;
滇池现代沉积物的主要理化性质研究
17.
Three-Dimensional Numerical Simulation in Rectangular Secondary Sedimentation Tanks Based on CFD;
基于CFD的平流式二沉池三维数值模拟
18.
Construction Technology of Half Top-down Method for Swirl Sedimentation Tank of Rolling Plant
轧钢厂旋流沉淀池半逆作法施工技术