说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 建闸
1.
The foundation of gated-weir of the Wanbahe Power Station is located on Quaternary deposit which is soft.
湾坝河水电站闸基坐落在第四纪砂砾石覆盖层上,属于软基上建闸
2.
Physical model study on floodgate of Xinyi Estuary Second-Phase Project
新沂河口二期建闸物理模型试验研究
3.
Necessity study of Sanyanggang flood gate at Xinshu River estuary
新沭河河口三洋港建闸的必要性研究
4.
Analysis results of an example show that this method can supply the foundation for the feasibility study of sluice construction in the estuary.
实例分析表明,该方法可为河口建闸可行性研究提供依据。
5.
Analysis on the Sediment Deposition of Yongdingxin River after the Built of Tide Gate;
永定新河挡潮闸修建后泥沙淤积分析
6.
Analysis of Causes to Breaking of the Steel Backs of Composite Brake Shoes and Suggestions
合成闸瓦钢背断裂的原因分析及建议
7.
Modeling and Simulation of Hydraulic System of Water Gate Using the Distributed Physical Net Modeling Approach
闸门液压系统分布式物理图网建模及仿真研究
8.
Study on Construction and Application of Automatic System in ShangHai Water Gate and Pumping Station
上海市水闸泵站自动监测系统建设与应用研究
9.
Suggestion to development of 4 locks along coast of Jiangsu Province based on sustainable development concept;
基于科学发展观的江苏沿海“四大港闸”发展建议
10.
Preliminary research on industry information and construction of river and sluice of Shanghai;
上海市河道水闸行业信息化规划与建设初探
11.
Studies on Small and Medium-sized Plain Sluice of Information Model by SketchUp
基于SketchUp中小型平原水闸建筑信息模型研究
12.
Modeling and Application Studies of a Novel Thyristor Controlled Phase Shifter
一种新型晶闸管控制移相器建模及其应用
13.
Research on improving the traffic capacity of the TGP ship lock during the completion period
提高三峡船闸完建期通过能力措施研究
14.
Plan layout optimization of ship lock extension project in Fuchun River
富春江船闸扩建改造工程平面布置优化研究
15.
Analysis and suggestion on a burnt-out fault of 220 kV breaker trip coil
一起220kV断路器跳闸线圈烧毁故障的分析与建议
16.
General layout for reconstruction project of Fuchun River lock
富春江船闸扩建改造工程总体布置方案
17.
On the construction method of cement injection pile used in strengthening and extension project of Caohu Gate
巢湖闸加固与扩建工程水泥粉喷桩的施工方法
18.
Construction of longitudinal cofferdam puncture sluice hole of expanding units civil engineering in Yanzhou hydropower station
艳洲水电站扩机土建工程纵向围堰穿闸孔施工