1.
The Damage to the Plants on the Limestone-slagged Wasteland and Measures Combating it;
石灰炉渣废弃地对植物生长的影响和治理对策
2.
A Research on On-line Simulation, Diagnosis of Limekiln and Intelligent Control of Complicated System;
石灰炉在线仿真技术与炉况诊断及复杂系统智能控制研究
3.
fluosolid lime calciner
沸腾式石灰渣焙烧炉
4.
Iron ore, coke, and limestone are put into the top of the furnace. These are called "charge".
铁矿石、焦碳、石灰石装进炉子的顶部。这些东西叫炉料。
5.
Discussion on Mixed Combustion of Blast Furnace Gas and Natural Gas in Lime Kiln
石灰窑混烧高炉煤气和天然气的探讨
6.
Development and Application of 500 m~3 Large Lime Shaft Furance
500m~3大型石灰竖炉的开发与应用
7.
Like definitions of fly ash ratio and bottom ash ratio, ash circulating ratio should be based on the amount of ash to furnace( including limestone).
它与飞灰份额、灰份额的定义一样,都应以入炉灰量(石灰石带入灰量)基准。
8.
Influence of limestone desulphurization to CFB thermal efficiency
添加石灰石脱硫对CFB锅炉热效率的影响
9.
Analysis on the problems in limestone system of 300 MW CFB boiler
300MW循环流化床锅炉机组石灰石系统问题分析
10.
The limestone particles are heated rapidly to high temperature upon entry into the boiler furnace.
当石灰石颗粒一进入锅炉炉膛,就迅速被加热到高温。
11.
This paper introduces the application of blast furnace gas on water-tube boiler, heating furnace, lime shaft kiln and coke oven.
介绍了韶钢高炉煤气在热电锅炉、加热炉、石灰竖窑、焦炉等工业炉窑上的应用情况。
12.
Operation Optimization of the Limestone/gypsum Wet Flue Gas Desulphurization System and Its Influence to Boiler;
石灰石/石膏湿法烟气脱硫系统的运行优化及其对锅炉的影响
13.
Possibility Research of TPCC 2×287MW Boiler Wet Limestone Flue Gas Desulphurization Engineering Technique;
石化电厂2×287MW锅炉石灰石湿法烟气脱硫工程技术可行性研究
14.
Study of Calcining Entire?Cast Furnace Lid Made with Mullite?Fly Ash
莫来石—粉煤灰整体浇注焙烧炉盖的研究应用
15.
Study on Comprehensive Utilization of Desulfuration Flyash Generated by CFB Boiler Combusting High Sulphur-containting Petroleum Coke and Coal;
CFB锅炉混烧高硫石油焦脱硫灰渣综合利用研究
16.
killed lime
消石灰, 失效石灰
17.
Several other materials can be used for liming purposes, such as, baked or burned oyster shells, marl, basic slag, wood ashes, and cement industry by-products.
其它几种物质也可用来施用石灰,如?壳灰、灰、渣磷肥(性炉渣)草木灰和工业水泥的副产品等。
18.
PROBLEMS EXISTING IN LIMESTONE CONVEYING SYSTEM OF 300 MW CFB BOILER AND RETROFIT THEREOF
300MW循环流化床锅炉石灰石输送系统存在问题及改造