1.
Study on the Landscape Pattern and Optimization Strategies of Shengzhong Reservoir in Nanbu County
南部县升钟水库库区景观格局与优化对策研究
2.
A Study of the Landscape Patterns of Shengzhong Reservoir in Nanbu County
南部县升钟水库库区景观格局现状分析与评价
3.
Research on Countermeasure of Ecological Environmental Protection and Pollution Prevention of Shengzhong Reservoir;
升钟水库生态环境保护与污染防治对策研究
4.
Application of the Universal Index Formula in Evalution of Shengzhong Reservoir Eutrophication
普适指数公式在升钟水库富营养化评价中的应用
5.
Research on the Effect to the Bank Slope in Inpounding and Drawdown of Three Gorges Reservoir Water Level;
三峡库区水位升降作用对库岸边坡影响研究
6.
Add 10 ml 0.05 M potassium permanganate (KMnO4) and then put it in a 95-100 c water bath for 30 minutes.
加入10亳升的0.05M高锰酸钾溶液(KMnO4),沸水浴30分钟。
7.
The Phytoplankton Population Structure and Its Changes in Dazhongling Reservoir in Four Seasons
大钟岭水库的浮游植物种群结构及四季变化
8.
On Driving Relation of Improving Human Capital for Reservoir Immigrant Entrepreneurship;
人力资本提升对水库移民创业的促动关系研究
9.
Analytic solutions for phreatic line in reservoir slope with inclined impervious bed under rainfall and reservoir water level fluctuation
库水位升降联合降雨作用下库岸边坡中的浸润线研究
10.
No leakage from the roof at testing rain storm of5 litre per square metre per minute.
屋顶每分钟每平方米5公升人工降雨试验,没有漏水。
11.
Five and a half hours later, just after midnight, the water-temperature trace suddenly jumped a full degree Celsius for about three minutes.
五个半小时之后,午夜刚过,水温线突然升高整整1℃,约达三分钟之久。
12.
What time will the sun rise?
太阳将在几点钟升起?
13.
boosted-high level clock generator
升压高电平时钟发生器
14.
APPLICATING STANDARDIZATION IN WAREHOUSE TO UPGRADE THE MANAGEMENT LEVEL OF JINDUICHENG MOLYBDENUM CO.,LTD.
实施库房管理标准化 提升金堆城钼业股份有限公司物资管理水平
15.
Upgrading,Reconstruction and Operation of the Anti-seepage Safety Supervision System in Chengbihe Dam
澄碧河水库大坝渗流安全监测系统升级改造及运行
16.
water-level ( in a reservoir,etc)
(水库等的)水平面
17.
They run up their national flag at five every morning.
他们每天早上5点钟升国旗。
18.
lifting piece for clocks or watches
钟表的齿条钩的提升装置