1.
A Novel Formulation for Scheduling of Non-sequential Multipurpose Batch Plants
一种改进的非顺序型多目的工厂间歇调度模型
2.
3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;
糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究
3.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
4.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
5.
"Sorts items alphabetically by Creator
"按编写者的英文字母顺序来排序项目
6.
"Sorts items alphabetically by Schedule
"按计划的英文字母顺序来排序项目
7.
"Sorts items alphabetically by Name
"按名称的英文字母顺序来排序项目
8.
Application of Abstract Factory Pattern in Accessing Multiple Database
抽象工厂模式在多种数据库访问程序中的应用
9.
A K-product Uncapacitated Facility Location Problem with Multi-type Clients
多类型客户k-种产品的工厂选址问题
10.
The Application of Multi-Objective Planning Theory to Optimize Excavation Sequence in the New Tunnel
多目标规划理论在新建隧道开挖顺序优化问题中的应用
11.
Removes the sorting method you applied. Tasks will be sorted as they are in the project file.
取消您应用的排序方法。任务的顺序将与项目文件中的顺序相同。
12.
Click Sort alphabetically to make the items in this category appear in alphabetical order by title.
单击“按字母顺序排序”可使此类别中的项目按标题的字母顺序显示。
13.
A structural model for large-scale projects is not far different from a job shop model.
一个大型工程项目的结构模型同一个定货加工厂的模型相差不远。
14.
Research on m*n Different Ordinal Scheduling Algorithm;
m*n不同顺序工件排序算法的研究
15.
At present, traditional alkaline deinking method is used in most deinking plant.
目前,大多数工厂采用的是传统碱性脱墨方法。
16.
Research on Industry Site Selection Based on Multi-object Decision Model;
基于多目标决策的工业厂址优化选择研究
17.
PRODUCTION PLANNING MODEL FOR SUPPLY CHAIN FOR MULTI-LOCATION PLANTS AND DISTRIBUTORS;
分布式多工厂、多分销商的供应链生产计划模型
18.
Development of Sequence Control System of Main Auxiliary Equipment and Accessories in Thermal Power Plant
火电厂主、辅机及辅助设备顺序控制系统的发展