1.
Experience on the shrink shaft drilling construction reserve period
缩短立井井筒凿井施工准备期的经验
2.
Technical code for anticorrosion of shaft equipment of vertical shaft of coal mine
煤矿立井井筒装备防腐蚀技术规范
3.
Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction
立井井筒装备施工吊盘布置方式探讨
4.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
5.
Monitoring data analysis of soil grouting reinforcement in vertical shaft
立井井筒地层注浆加固实测数据分析
6.
The ConstructionAnalysis of Anti-Well Method Through Falling Soft Rock Section
反井法施工立井井筒过软岩垮落段实践分析
7.
Dynamic Analysis on the Stabality of the Freeze Shaft Lining in Thick Top Soil;
深厚表土中的冻结立井井筒稳定性动态分析
8.
New Ideas and Construction Practice Concerning Air Shaft Material in the Compressible Layer
立井井筒可缩层选材的新思路与施工实践
9.
Increasing Blasting Efficiency of Frozen Rock and Speedingup Shaft Construction
提高冻结基岩爆破效率 加快立井井筒施工速度
10.
The Simple Discussion on the Safe Construction of Deep Thick Swelling Clay Layer of Vertical Shaft
浅谈立井井筒深厚冻结膨胀粘土层的安全施工
11.
The Grouting Technology for Water Plugging in Bedrock Faultage of the Vertical Shaft
浅谈立井井筒基岩段断层带堵水注浆技术
12.
On exploration of lifting rubber-tyred vehicle for vessel layout in shaft of vice mine
提升胶轮车副立井井筒提升容器布置设计探讨
13.
Based on Systems Engineering to Optimize Design of Shaft Drainage
基于系统工程的立井井筒排水管路优化设计
14.
Quick Construction Technology of Big Section Deep Shaft with Freezing Surface Soil
大断面深立井井筒冻结表土段快速施工技术
15.
Construction Practice on Rapid Driving through Silt Layer in Large-bore Vertical Shaft
大断面立井井筒快速通过砂土层的施工实践
16.
Calculation Method of Surface Pre-grouting Result Inspection and Measurement for Mine Shaft Sinking
立井井筒地面预注浆效果检测的计算方法
17.
Research and Application of Face Beforehand Grouting Intercept Water Technology in Shaft
立井井筒工作面预注浆堵水技术的研究与应用
18.
The Construction Technology of the Frozen Air Shaft with Huge-Thick Soil and Major Diameter
巨厚表土层大直径立井井筒冻结法施工技术