1.
Analysis of Machine Tool NC Retrofitting Prospect and Project;
机床数控化改造业的发展前景与改造方案分析
2.
Junshan Specific Area Landscape Transformation Program;
君山景区景观具体改造方案——君山景区景观改造方案研究之二
3.
The retrofit scheme is analyzed and summarized in the aspect of maintenance.
从检修角度对改造方案进行了剖析。
4.
A STUDY OF THE TECHNOLOGICAL PROCESS REFORM PLAN FOR THE NGL RECOVERY DEVICE IN NANCHONG
南充轻烃回收装置工艺改造方案研究
5.
Discussion on modification of CSP rolling station yard
薄板厂投产轧钢站车场改造方案探讨
6.
The Research of the Reconstruct Project on Operation Optimization of Water Injection Pumping Station;
油田注水泵站优化运行改造方案研究
7.
Study on Improvement of the Main Transmission System in 2800 Rough Mill;
2800热粗轧机主传动系统改造方案研究
8.
The Optimum Design of Massive Fracturing Treatment Plan for Block Shen 95 of Liaohe Oil Field;
沈95块整体压裂改造方案优化设计
9.
Research on the Reconstruction of IPTV Bearing Network and Its Feasibility;
IPTV承载网络改造方案与可行性研究
10.
The Improving Scheme with Real-Time Based on Scheduling System of Linux2.6;
基于Linux2.6调度系统的实时化改造方案
11.
The Scheme for JiLin Posts Electronic Remittance Access System Reform;
吉林邮政电子汇兑接入系统改造方案
12.
Discussion for the Measurement System Reconstruction of Boiler Drum Level;
锅炉汽包水位测量系统改造方案探讨
13.
School LAN Update and Innovation Project Built on Tactic Route;
基于策略路由的校园网升级改造方案
14.
Improving Plan of HG-120/39-450-2 Type Economizing Machine for Coal Powder;
HG-120/39-450-2型煤粉炉省煤器改造方案
15.
Improned Proposal of 40/10 Ton Crane;
40/10t旋转吊钩桥式起重机的改造方案
16.
The Scheme and Measures for the Renovation of 35kV Transformer Substation;
35kV变电站技术改造方案的实施
17.
Researching the Reforming Method of 386/486 computer Room;
386、486计算机教室改造方案研究
18.
The Scheme Design of Crude Oil Dehydration Power Supply in Automation Retrofit
油田原油电脱水自动化改造方案设计