说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 引风机
1.
Installation of ID fan combined with FGD booster fan for 1 000 MW units
GW级机组引风机与增压风机合并设置
2.
Discussion on Combining Scheme between Induced Fan and Desulphurization Booster Fan
引风机与脱硫增压风机合并方案论证
3.
AN APPROACH TO PROBLEM OF SCRAMBLING FOR AIR OF AXIAL I. D. FANS WITH STATIONARY BLADE ADJUSTMENT
静叶调节轴流式引风机抢风问题探讨
4.
Study on Energy-saving Program for Draft Fan of a 250MW Thermal Power Unit
250MW火电机组引风机节能方案研究
5.
Research on Abnormity about Induced Fan in 300MW Power Plant
300MW机组引风机运行异常试验研究
6.
The Application of Boosting Fan and IDF Coordinated Control System
增压风机和引风机协调控制策略的应用
7.
Techno-economic Analysis on Integration of Induced Draft Fan of Boiler and Booster Fan of Desulphurization System
锅炉引风机与脱硫增压风机合一技术经济分析
8.
Technology Transformation of Energy Saving by Variable Frequency Speed Control of Blast and Induced Draft Fans in Hot Water Boiler;
热水锅炉鼓引风机变频节能技术改造
9.
Cause Analysis and Treatment of Power Plant Boiler Fan Vibration Modified
电站锅炉引风机振动原因分析及处理
10.
REASON ANALYSIS AND SOLUTION FOR HEAT GENERATING FROM DRAUGHT FAN BEARING
引风机轴承发热原因分析及处理方法
11.
Cause Analysis on Large Vibration of Induced Fan During Commissioning of a 1000MW Power Unit
1000MW机组调试期间引风机振动大的原因分析
12.
Analysis on the Renovation of Boiler ID Fan Inverter in 600 MW Thermal Power Plant
600MW火电机组锅炉引风机变频器改造效果分析
13.
Type Selection of Induced-dralt Fan for 600MW Supercritical Coal-Fired Power Unit
600MW超超临界燃煤发电机组引风机选型分析
14.
Electric operation optimization of 300 MW unit induced draft fan oil station
300 MW机组引风机油站电气运行方式的优化
15.
Testing Procedure and Analyses of Super Criticality Unit's FDF/IDF RUNBACK
超临界机组送、引风机RUNBACK试验过程及分析
16.
Cause Analysis and Countermeasures of Large Deviation of IDF Current in Utility Boiler
电站锅炉引风机电流偏差大的原因分析及对策
17.
Analysis of Flow Passage Parts and Internal Flow Characteristics on Large Axial Induced Draft Fan;
大型轴流引风机通流部件及其内流特性分析
18.
trailed air-blast sprayer with engine drive
机动牵引式鼓风喷雾机