1.
Group Technology Scheduling Problem with Linear Deterioration of Processing Time for Single-machine
工件加工时间线性恶化的单机成组加工问题
2.
Scheduling Models with Jobs' Processing Times Being Nonconstant;
工件加工时间非恒定的排序模型研究
3.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
4.
Group Technology Scheduling Problem with Resource Dependent Processing Time For Single-Machine
加工时间依赖资源的单机成组加工问题
5.
A new formation and solution for batch chemical process stochastic scheduling with uncertain processing time
加工时间不确定的间歇化工过程随机调度研究
6.
Single Machine Scheduling Under job Processing time is a Linear Deterioration of its Start time
工件加工时间是开工时间线性函数的单机排序问题
7.
The Optimum with the Shortest total Processing Time of on-Time Jobs
不误工工件加工时间之和最小的最优解
8.
Products with thermal properties that cause slow heating andor cooling rates require longer process times.
传热率低的产品需要更长的加工时间。
9.
Some Scheduling Problems with Environment Dependent Processing Times
几类加工时间与环境有关的排序问题
10.
work overtime
(超出时间的工作)加班
11.
The workmen want to decrease the number of working hours and to increase pay.
工人们要求减少工作时间而增加工资。
12.
The workmen want to decrease the working hours and to increase pay.
工人们要减少工作时间,并要增加工资。
13.
Displays tasks in the timesheet that have overtime work applied to them.
显示时间表中具有加班工时的任务。
14.
Sometimes he has to do his work on his own time
有时候他要在非工作时间里加班
15.
Sometimes he had to do his work on his own time.
有时候他要在非工作时间里加班。
16.
The Electrophysiological Index for the Automatic and Control Processing of Temporal Information
时间信息自动加工与控制加工的电生理学指标
17.
unsocial hours
与正常社交活动时间相冲突的加班工作时间
18.
The Relationship Between Temporal and Non-temporal Information in Cognitive Processing;
认知加工中时间与非时间信息的相互关系