1.
Regressive analysis of desulfurization efficiency for circulated half dry FGD
循环半干法烟气脱硫装置脱硫效率的回归分析
2.
Cost Research of Thermal Power Plant FGD System
火电厂烟气脱硫装置成本费用的研究
3.
Inquire into operation reliability of flue gas desulphurization equipment without by-pass
无旁路烟气脱硫装置运行可靠性探讨
4.
Thermal Power Plant FGD Absorber Flip Construction Technology
火力发电厂烟气脱硫装置吸收塔倒装施工工艺
5.
The Experimental Study on the Equipment and the Desulfurization of Semi-dry FGD for the Spouted Bed;
半干式喷动床烟气脱硫装置及其脱硫性能的实验研究
6.
Technical Characteristic of XZKP Model FGD Device with High Efficiency and Hollow Tower Spray
XZKP型高效空塔喷淋烟气脱硫装置技术特点
7.
Operation analysis of FGD system in Guangdong Thermal Power Plants
广东省火电厂烟气脱硫装置运行情况分析
8.
Action of Assay Analysis in operation of Wet Flue Gas Desulfurization System
化验分析在湿法烟气脱硫装置运行中的作用
9.
Operation Analysis and Optimization Suggestions for Flue Gas Desulfurization Devices of Thermal Generating Units
火电机组烟气脱硫装置运行分析及优化建议
10.
Research on DCS of lime stone/gypsum wet FGD system
石灰石-石膏湿法烟气脱硫装置的DCS控制研究
11.
Study on the New Befit Scrubber of Desulfurization of Flue Gas from Coal Burning Boiler
新组合式燃煤锅炉烟气脱硫装置的研究
12.
Analysis of Thermal Power Plant FGD Design Status in Guangdong
广东省火电厂烟气脱硫装置设计状况分析
13.
Influence and Control of Electrostatic Precipitators and Wet Flue Gas Desulfurization Systems on the Speciation of Mercury in Flue Gas
静电除尘器和湿法烟气脱硫装置对烟气汞形态的影响与控制
14.
Discussion about the measurement method of calcium-sulfur proportion and limestone consumption in FGD performance test
湿法烟气脱硫装置性能试验中钙硫比及石灰石耗量测试方法探讨
15.
Study of Safe and Economic Operation of Wet Limestone-gypsum Flue Gas Desulfurizing Device;
石灰石—石膏湿法烟气脱硫装置安全、经济运行研究
16.
The Study and Design of Monitored Control System for The Flue Gas Desulfurization Equipments in Power Plant;
燃煤电站锅炉烟气脱硫装置监控系统研究与设计
17.
The Thermal Power Plant Fgd s Equipment of Wet Method in the Economy Circulate;
火电厂石灰石——石膏湿法烟气脱硫装置的经济运行
18.
Operation and maintenance of typical instrument and control equipment of flue gas desulphurization system in power plant
火电厂烟气脱硫装置典型仪控设备运行维护分析