说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 梯级开发
1.
The Demonstration of Waterpower Gradual Exploitation in the Datong River Section in Gansu;
大通河甘肃省河段水电梯级开发论证
2.
The Explore for the First Time of the Culture Industry s Stave Develops and Makes Use of in our Country;
我国文化产业的梯级开发和利用初探
3.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
4.
Study on Cumulative Effects Assessment of Cascade Hydropower Development in Drainage Area;
流域水电梯级开发累积环境影响评价研究
5.
Researchs on Flood Resources under the Condition of Red River s Cascade Development;
红水河梯级开发条件下洪水资源化利用研究
6.
The Impact of Cascade Exploitation on the Phytoplankton in the Upper Reaches of the Wujiang River;
乌江上游梯级开发对浮游植物分布的影响研究
7.
Discussion on Stage Developmental Model in Large Scale Information System;
大型信息系统建设的梯级开发模式探讨
8.
Discussion About Power Market and Hydropower Cascade Development of River Basin;
电力市场与水电流域梯级开发问题探讨
9.
Study of the Terrestrial Eco-Environment Impact Assessment of Cascade Hydropower Development
水电梯级开发陆生生态环境影响评价研究
10.
Practice in project management of hydropower cascade development of downstream Jinsha River
金沙江下游水电梯级开发建设项目管理实践
11.
Research Development of Basin Cascade Hydropower Development and Environment Ecological Protection
流域水电梯级开发与环境生态保护的研究进展
12.
Study on Methane Emission of Cascade Reservoirs on Maotiaohe River Basin in summer
猫跳河流域梯级开发水库夏季甲烷排放研究
13.
Model and applications of environment impact assessment of cascade hydropower development
水电梯级开发对生态环境影响评价模型与应用
14.
CUMULATIVE EFFECTS OF WATER TEMPERATURE BY CASCADE HYDROPOWER STATIONS BUILT ON UPPER AND MIDDLE REACHES OF THE WUJIANG RIVER
乌江干流中上游水电梯级开发水温累积效应
15.
The Research and Development of Robot Deburring System for Escalator Step;
自动扶梯梯级机器人去毛刺系统的开发应用
16.
Research on Water Requirement of CHIBUSU Watershed Ecosystem after Exploitation of Cascade Hydropower Stations;
赤不苏流域梯级电站开发的生态环境需水研究
17.
The Optimization Analysis of the Large Cascade Hydropower Station s Financing Combination in the Rolling Development;
梯级电站滚动开发中的融资组合优化分析
18.
The Theory and Practice of Cascade Hydroelectric Scrolling Development of Huanghe Upstream;
黄河上游梯级水电滚动开发理论与实践