1.
The paper describes about the technology of steam explosion pulping (SEP) and some questions should be concerned in production application of SEP, and countermeasures to overcome the questions are got.
本文主要论述了蒸汽爆破制浆工艺及在生产使用中所存在的问题和应采取的对策和解决办法。
2.
Study on the Process and Mechanism of Steam Explosion Pulping of Lingnania Chungii Mcclure;
粉单竹蒸汽爆破法制浆及其机理研究
3.
Study on the Process and Mechanism of Steam Explosion Pulping of Bagasse;
蔗渣蒸汽爆破法制浆工艺及其机理研究
4.
Exploration of Grouting in Blasting Perfoliate Crack of Dongfeng Liangbei Well
梁北东风井爆破贯穿裂隙注浆的探索
5.
On the Study of Blasting Vibration Mechanism and the Control of Blasting Vibration Effects;
爆破震动机理及爆破震动效应控制的研究
6.
The Application of Presplit Controlled Blasting Technique in the Hard Rock Blast
预裂控制爆破技术在坚硬岩石爆破中的应用
7.
Study on the Non-Pollution Bleaching of Steam-Exploded Pulps from Non-Wood Fibers;
非木材汽蒸爆破浆无污染漂白方法的研究
8.
The mechanic affection on the blast hole walls is simply analysed and cracking propagation caused by shaped charge is explained in this paper.
简单分析了聚能爆破装药在孔内爆破的力学效应,阐明了聚能爆破对岩石定向破裂的控制机理。
9.
Design and Construction of Non-electric Relay Network in Deep-hole Controlled Blasting at Zhubaoshan
珠包山深孔控制爆破起爆网路设计与施工
10.
Quality and Safety Control on Blasting of Mountain for Tianwan Nuclear Power Plant Extension Project
田湾核电站扩建山体爆破工程爆破质量安全控制
11.
THE SUCCESSFUL APPLICATION OF CONTROLLING BLASTING TECHNIQUE IN SHENBU COPPER MINE
控制爆破技术在深部铜矿的成功应用
12.
Establishment and Evolvement of the System for Industrial Explosive Material Market;
民用爆破器材市场的制度形成与演变
13.
Middle and Deep Hole Controlled Blasting of Rock Cut in the Complicated Surroundings;
复杂环境下路堑土岩中深孔控制爆破
14.
Analysis and Control of the Risk of Cost Estimation in the Blasting Engineering;
爆破工程成本估算风险性分析与控制
15.
The design of blasting control of the hard rock in large cross-section undersea tunnel
超大断面海底隧道硬岩控制爆破设计
16.
PRACTICE IN CONTROLLED BLAST REMOVAL OF THE SHANGPAI RIVER BRIDGE
上派河大桥控制爆破拆除的施工实践
17.
Rotary drilling machine replacing downhole drill to accomplish controllable blasting of slope
牙轮钻取代边坡钻完成边帮控制爆破
18.
Discussion About the Problem of Shearing Point Forward Shiftting During Demolition by Controlled Blasting
控制爆破拆除中转铰点前移问题探讨