1.
Reasons for Length Change and Adgustment Method at Fully Mechanized Coal Face
综采工作面长度发生变化原因及调整方法
2.
Analysis on the factors of influencing length of fully mechanized mining face in steep inclined seam
大倾角煤层综采工作面长度因素分析与对策
3.
Study on prediction of underground pressure Intensities in mining face of great-height and ultra-length of shendong
神东大采高超长工作面矿压显现强度预测研究
4.
Research on Reasonable Hanging Arch Length of Hard Roof in Fully Mechanized Coal Mining Face
综采工作面坚硬顶板合理悬顶长度研究
5.
Joy longwall loading machine
乔伊长壁工作面装载机
6.
These vehicles cannot stay on your plane for any length of time at all.
这些交通工具不能在你们层面上作任何长度时间的停留。
7.
Long Borehole Blasting Mining Technique of Unmanned Operated Coal Mining Face
无人作业工作面长孔爆破落煤回采工艺
8.
Surface Source Pollution Control in the Dongjiang--Shenzhen Water Supply Scheme
东深供水工程面污染源管理工作制度
9.
longwall peak stoping
V形工作面向下梯段长壁回采法
10.
Workunits have slightly been increased in overall length.
工作包的长度被稍微增加了一点。
11.
Design of Die Land Length for Extrusion of Aluminum Shape
铝型材挤压模工作带长度的设计方法
12.
Skewed Slot Wheeled Seeding Mechanism Working Length Comparative Trial Research
斜槽轮式排种器工作长度的对比试验
13.
Analysis for the current situation of head nurses’work satisfaction in Changsha
长沙地区医院护士长工作满意度现状分析
14.
Idea on combined coal mining technology with multi coal shearers for longwall coal mining face
长壁工作面多采煤机联合采煤工艺的构想
15.
Roadway Arrangement Using the Openstope Coal-mining Method for Unmanned Operation Face Using Long-hole Blasting in Steeply Inclined Coal-seam
长孔爆破无人作业工作面空场采煤法巷道布置
16.
The work plan of environmental protection of 2001 was completed.
2001年度环境保护工作计划全面完成。
17.
Determination of the Growd Driving Auger Stem Pump Working System
地面驱动采油螺杆泵工作制度的确定
18.
Recommending Fine League Members for Party Membership in Colleges and Universities: Its Basis,Points& Areas, and Systems;
高校“推优”工作的基础、点与面、制度