1.
OPTIMIZATION DESIGN OF RIGID FRAMES FOR THE SHAFT AND TOP OF A 3 200 m~3 BLAST FURNACE IN LIAN STEEL COMPANY
涟钢3200m~3高炉炉身、炉顶刚架优化设计
2.
And the charge of molten iron is poured into the top.
从炉顶上把铁水倒入炉中。
3.
Control techniques for bell-less top in the new No. 3 BF of WISCO
武钢新3号高炉无料钟炉顶控制技术
4.
Installation of bell-less top steel ring for blast furnace
炼铁高炉无料钟炉顶钢圈的安装技术
5.
Improvement of the Cleaning Zone Roof Structure of Nickel Flash Smelting Furnace Jinchuan
金川镍闪速炉贫化区炉顶结构的改进
6.
The application of fire-resistant plastic materials in the top of the heating furnace;
浅谈耐火可塑料在加热炉炉顶的应用
7.
An Improvement on Pressure Equalizer at Furnace Top of No.1 Blast Furnace;
武钢1~#高炉炉顶均压系统的改进
8.
The new methods of burden distribution with width burden in a bell-less top blast furnace
高炉无钟炉顶按料流宽度布料新方法
9.
Discussion on Reducing the Space Temperature at the Top of 7.63m Coke Oven in Yankuang
降低7.63m焦炉炉顶空间温度的探讨
10.
Dynamic simulation of transmission system of blast furnace top charge distributor
高炉炉顶布料器传动系统动力学仿真
11.
Analysis on temperature distribution in the space of 7.63 m coke oven top
7.63m焦炉炉顶空间温度的影响及分析
12.
TRT Device on the Influence of Blast Furnace Top Pressure and Control
TRT装置对高炉炉顶压力的影响和控制
13.
STUDY ON THE WIND LOAD FOR THE FURNACE TOP OF HUGE BLAST FURNACE
特大型高炉炉顶系统风荷载试验研究
14.
THE APPLICATION OF CONTINUOUS ANALYSIS TECHNIQUE IN BF TOP COMPREHENSIVE GAS
高炉炉顶综合煤气连续分析技术应用
15.
Constructing Practice of Changing Top Equipment and Coating Inner Wall of Blast Furnace At The Same Time
高炉炉顶设备更换与炉内喷涂同时施工的实践
16.
Furnace top electronic scale is an indispensable device for automatic control system of the furnace without bell roof.
炉顶电子秤是无钟顶高炉自动控制系统中不可缺少的一个装置。
17.
Discussion on Factors Affecting Plastic Arch of Heating Furnace and Prevention Measures
影响可塑料加热炉炉顶拱顶的因素和预防措施探讨
18.
Manufacture and Application of Fleet Mending Materials for Top Liner of Heat Treatment Furnace
热处理炉炉顶快速修补料的研制与应用